At Your Service 24/7
HomeContactPrint
Go To Search
Schedule of Reported Lane Closures For County Roads

Schedule Of Reported Road Closures For County Roads

The following Hillsborough County roads are those where permits have been granted for scheduled closure.
** Indicates date extension.

Closings last updated: Tuesday, July 26, 2016. This list is sorted by road name.

Road From To Reason Closed From Closed To
 N. 15th Street E. Fletcher Avenue E. 131st Avenue Trim trees for Tampa Electric 07/18/2016
   9:00 AM
08/29/2016
   4:00 PM
 19th Avenue S. 48th Street S. 49th Street S. Install blow off valve 07/22/2016
  8:00 AM
07/30/2016
   5:00 PM
 N. 19th Street E. 127th Avenue E. 131st Avenue Trim trees for Tampa Electric 07/18/2016
   8:00 AM
08/29/2016
   5:00 PM
 23rd Avenue N. 76th Street Kingswood Drive Installation of 6" DIP Water Main 05/09/2016
   8:00 AM
01/07/2017
   5:00 PM
N. 42nd Street Fletcher Avenue Skipper Road Reconstructing Roadway 03/07/2016
9:00 AM
07/29/2016
4:00 PM
AFTER THE FACT
N. 42nd Street
Ashford Green Place Cambridge Woods Drive Temporary for Deliveries using flagmen 02/15/2016
9:00 AM
07/29/2016
3:00 PM
 N. 48th Street E. Diana Street E. Hanna Avenue  Tree trimming over Rod & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 N. 49th Street E. Diana Street E. Idlewild Avenue  Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
0831/2016
   5:00 PM
 N. 50th Street E. SLigh Avenue 289 Ft. South of E. Cifton Street Tree trimming over Road & R.O.W. 07/26/2016
    9:00 AM
08/31/2016
   4:00 PM
 50th Street N. USF Elm Drive Bordeaux Village Place Replace Pole  07/25/2016
   8:00 AM
08/25/2016
   5:00 PM
 N. 53rd Street E. SLigh Avenue E. Diana Street Tree trimming over Road & R. O. W. 07/26/2016
    8:00 AM
08/31/2016
    5:00 PM
 N. 54th Street E. Sligh Avenue E. Diana Street Tree trimming over Road & R.O.W. 07/26/2016
    8:00 AM
08/31/2016
    5:00 PM
 N. 78th Street  Sequioa Avenue Temple Terrace Highway Trim trees for Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
   5:00 PM
 E. 131st Avenue Livingston Avenue N. 15th Street Trim trees for Tampa Electric 07/18/2016
   9:00 AM
08/29/2016
   4:00 PM
 E. 132nd Avenue N. 22nd Street N. 23rd Street Trim trees for Tampa Electric 07/18/2016
   8:00 AM
08/29/2016
   5:00 PM
 Adrean Place Cloister Drive Cul De Sac Inlet top replacement   0 7/05/2016
    8:00 AM
10/04/2016
    5:00 PM
 Allegheny Drive W. Del Webb Boulevard Monmouth Drive Inlet top replacement 0 7/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Atrium Drive W. Del Webb Boulevard W. Del Webb Boulevard Inlet top replacement 0 7/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Azalea Landing Court W. Del Webb Boulevard Cul De Sac Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Balm Riverview Road Woodside Drive Big Bend Road Replace Power Poles 06/29/2016
   9:00 AM
08/19/2016
   4:00 PM
 Bay Pointe Drive Lodestone Drive Dead End Curb and gutter repair and asphalt patch 07/21/2016
   8:00 AM
08/21/2016
  5:00 PM
 E. Bearss Avenue Livingston Avenue Skipper Road Trim trees for Tampa Electric 07/18/2016
  9:00 AM
08/29/2016
   4:00 PM
TIME REVISED
 Bearss Avenue
Dale Mabry Highway Florida Avenue Mill and Resurface 06/06/2016
  8:00 PM
09/01/2016
   5:00 AM
 EXTENSION
Bellamy Road
Turtle Creek Boulevard Brookdale Way Top off walls, tie in bridge 07/06/2016
   9:00 AM
01/28/2017
   4:00 PM
 Bentwood Drive W. Del Webb Boulevard N. Pebble Beach Boulevard Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Blake Road Tarpon Springs Road Crescent Road Replace Power Poles 07/2/2016
   8:00 AM
07/29/2016
   5:00 PM
 Bloomingdale Avenue Bent Oaks Street Little Oak Street Install Facilities On Existing Pole 06/27/2016
   9:00 AM
07/27/2016
   4:00 PM
 Bloomingdale Avenue Pearson Road Hillgrove Road Line Clearance  07/25/2016
   9:00 AM
08/06/2016
   5:00 PM
Boyette Road Dorman Road Lithia Pinecrest Road Install Natural Gas Main 04/01/2016
9:00 AM
11/30/2016
4:00 PM
 EXTENSION
Bruce B Downs Boulevard
Bearss Avenue Lake Forest Drive Using a 24/7 Lane Closure on the 3rd most right lane (which becomes a designated turn only) to perform work on the 42 inch Storm Line on Bruce B Downs Boulevard between Beass Avenue and Lake Forest Drive 06/13/2016
   9:00 PM
07/31/2016
   5:00 AM
Bruce B Downs Boulevard Gilligans Way Palm Springs Boulevard Shifting Traffic Per Phase II at Gilligans Way to Palm Springs Boulevard 03/24/2016
9:00 PM
10/31/2016
6:00 AM
Intersection of Bryan Road and Brooker Road Intersection Improvements/Signalization 05/01/2016
9:00 AM
11/01/2016
4:00 PM
 Butler Road John Moore Road Dead End  Installing A Pole  07/25/2016
   8:00 AM
08/25/2016
   5:00 PM
 Butterfly Place Cloister Drive Cul De Sac Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00PM
 Cape Bend Avenue Terry Lane Greenleaf Drive Desilt & CIPP existing RCP, Replace C.I. Top, Seal all lined pipe-structures connections 07/25/2016
   8:00 AM
09/30/2016
  5:00 PM
Carrollwood Village Run N. Village Drive S. Village Drive Fire Hydrant Replacement 05/09/2016
8:00 AM
07/29/2016
5:00 PM
Casey Road at Ehrlich Road Connection to existing force main encroaches into intersection on Casey Road and Ehrlich Road 11/19/2015
9:00 AM
08/11/2016
4:00 PM
 Charlie Taylor Road Knights Griffin Road US Highway 92 Mill and Resurface 07/25/2016
   8:00 AM
08/31/2016
   5:00 PM
 Chatford Avenue S. Mulrennan Road Piney Branch Circle Sidewalk repair and replacement 06/20/2016
    8:00 AM
09/16/2016
    5:00 PM
 Chipaway Drive Dead End Pebble Beach Lane Desilt & CIPP Existing RCP, Seal All Linned Pipe Structures Connections 07/25/2016
  8:00 AM
09/30/2016
   5:00 PM
AFTER THE FACT 
Citrus Park Drive
Sheldon Road Citrus Park Town Center Boulevard Curb Replacement and restoration in Median area  06/01/2016
   9:00 AM
08/05/2016
   4:00 PM
 Cloister Drive W. Del Webb Boulevard N. Pebble Beach Boulevard Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
Cloverlawn Drive East Course Drive West Course Drive Installation 8" RWM in neighborhood in shoulder 11/19/2015
8:00 AM
08/11/2016
5:00 PM
 E. Cluster Avenue N. 50th Street Dead End  Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
Colson Road  Robinson Farm Lane McDonald Road SPT vertical borings on shoulder and pavement cores in lane 07/26/2016
   8:00 AM
07/29/2016
  5:00 PM
 Columbine Place Cloister Drive Cul De Sac Inlet top replacement 07/05/2016
   8:00 AM 
10/04/2016
   5:00 PM
EXTENSION
 CR 581 Bruce B Downs Boulevard
Just South of Bearss Avenue Palm Springs Boulevard  Single Lane in RT1 or RT2, to construct pavement sections of roadway widening Project. As well as install Underground Utilities/Storm Crossing. Closures will shift lanes as needed for completion of road crossings, with only one lane closed at any given time. 02/08/2016
   7:30 AM
10/05/2016
   3:00 PM
 EXTENSION
CR 581 Bruce B Downs Boulevard
Just South of Bearss Avenue Palm Springs Boulevard Night Work, Single lane closure in RT1 or RT2, to construct pavement, sections of roadway widening Project. As well as install Underground Utilities/Storm crossing. Closures will shift lanes as needed for completion of road crossings, with only one lane closed at any given time 02/08/2016
   9:00 PM
10/05/2016
   6:00 AM
EXTENSION
CR 581 Bruce B Downs Boulevard
Tampa Palms Boulevard W. Bearss Avenue  Single lane closure in LT1 or LT2, left lane, to construct temporary pavement section for roadway widening project, as well as install Storm Crossings and patch asphalt, Closures will shift lanes as needed for completion of Road Crossings, With only one lane closed at any given time. 02/08/2016
   9:00 AM
10/05/2016
   4:00 PM
 EXTENSION
CR 581 Bruce B Downs Boulevard
 Tampa Palms Boulevard Bearss Avenue Single lane closure in LT1, left lane, to construct temporary pavement section for roadway widening project as well as install Storm Crossings and patch asphalt Closures will shift lanes as needed for completion of Road Crossings with only one lane closed at any given time. 02/08/2016
   6:00 PM
10/05/2016
   7:00 AM
 C.R. 672 Rough Diamond Ranch Drive Bledsoe Loop Replace Pole In R-O-W 07/18/2016
   9:00 AM
07/29/2016
   4:00 PM
 C.R. 672 Romeo Boulevard US Highway 301 Jack and Bore Water Main 07/05/2016
   9:00 AM
07/29/2016
   4:00 PM
 Copeland Road Morris Bridge Road US Highway 301 Trim trees for Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
   5:00 PM
 Countryway Boulevard Woodbay Drive Steppingstone Boulevard CSX Railroad Repairs 08/01/2016
   10:00 AM
08/01/2016
   5:00 PM
Crystal Greens Drive Cul De Sac Lenox Greens Drive Inlet top replacement 04/06/2016 8:00 AM 10/04/2016 5:00 PM
Crystal Greens Drive Lenox Greens Drive Cul De Sac Inlet top replacement 04/06/2016 8:00 AM 10/04/2016 5:00 PM
 Cumberland Drive N. 50th Street N. 53rd Street Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Cumberland Place Cumberland Drive Dead End Tree trimming over road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Davis Road Harney Road Trevor Oak Road Trim trees for Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
   5:00 PM
Dawnview Drive/Casey Road Ehrlich Road Northdale Boulevard Water Main Installation, Close the entire northbound lane on Casey Road from Ehrlich Road to West Bank Avenue and detour traffic 11/17/2015
8:30 AM
08/11/2016
5:00 PM
 W. Del Webb Boulevard Allegheny Drive Brookton Green Drive Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 E. Diana Street N. 47th Street N. 56th Street Tree trimming over Road & R.O.W. 07/26/206
   8:00 AM
08/31/2016
  5:00 PM
 Donneymoor Drive Lake Hills Drive Tralee Drive Storm Water Improvements/Culvert Replacement  07/20/2016
  8:00 AM
12/04/2016
   5:00 PM
Dorman Road Foster Carriage Road Boyette Road Install Natural Gas Main 04/01/2016
8:00 AM
11/30/2016
5:00 PM
Ehrlich Road Burrington Drive Winterwind Drive Installing New Traffic Signal 04/25/2016
9:00 AM
10/03/2016
4:00 PM
EXTENSION
Ehrlich Road
Del Vale Road Carrollwood Meadows Drive SR 589 Widening and Resurfacing Between Gunn Highway and Sugarwood Toll Plaza 12/05/2015
8:00 AM
01/28/2017
   4:00 PM
Emerald Dunes Drive Noble Faire Drive Myrtle Vista Court Inlet top replacement 04/06/2016 8:00 AM 10/04/2016 5:00 PM
 Emerald Dunes Drive Rimini Vista Way Regal Manor Way Inlet Top Replacement 05/106/2016
     8:00 AM
10/04/2016
   5:00 PM
 Estates Del Sol Drive Rodeo Lane Pajaro Drive Replace Wood Pole In R-O-W 07/18/2016
   8:00 AM
07/29/2016
   5:00 PM
 Esthel Road Morris Bridge ROad Old Harney Road Trim trees for Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
     5:00 PM
 N. Falkenburg Road Queen Palm Drive E. Broadway Avenue Replace Power Poles/Replace Underground Cable 07/19/2016
   9:00 AM
07/26/2016
   4:00 PM
 Falkirk Place Lake Hills Drive Dead End  Storm Water Improvements/Culvert Replacement  07/20/2016
   8:00 AM
12/04/2016
   5:00 PM
 Faxton Drive W. Del Webb Boulevard Meadowlark Lane Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Fletcher Avenue Lettuce Lake Parkway Telecom Drive Replace Power Poles 07/20/2016
   9:00 AM
08/03/2016
   4:00 PM
EXTENSION
 E. Fletcher Avenue
N. Nebraska Avenue Bruce B. Downs Boulevard Inside and center lanes (possible turn lanes) for landscae work in medians 04/25/2016
   9:00 PM
08/26/2016
   5:00 AM
 E. Fowler Avenue/Main Street Boki Lane County Road 579 Lines Clearance 07/27/2016
   9:00 AM
08/25/2016
  4:00 PM
 Fort Duquesna Drive W. Del Webb Boulevard N. Pebble Beach Boulevard Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Geraci Road Dale Mabry Highway End of Geraci Road Utilities installation and ROW Construction 07/26/2016
   8:00 AM
09/30/2016
   5:00 PM
 Grand Cypress Lane W. Del Webb Boulevard W. Del Webb Boulevard Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
AFTER THE FACT 
Gunn Highway
Lynn Turner Road Four Oaks Curb Replacement and restoration in Median area  06/01/2016
   9:00 AM
08/05/2016
   4:00 PM
EXTENSION
 Gunn Highway
Gunn Highway Olive Jones Road Top off walls, tie in bridge, demo, deck pans 07/06/2016
   9:00 AM
01/28/2017
   4:00 PM
 Hamilton Street N. Whittier Street Wrenwood Circle Tree trimming over road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Hanley Road Fountain Avenue Woodbridge Boulevard Bridge Approach Milling/Paving  #104267 07/22/2016
   9:00 AM
07/29/20106
   4:00 PM
Hanley Road Hollowell Drive Waters Avenue Rehab Lift Station-Close Outside Northbound Lane If Necessary 05/02/2016
9:00 AM
07/30/2016
4:00 PM
 E. Hanna Avenue N. 43rd Street Harney Road Tree trimming over Road & R.O.W. 07/26/2016
   9:00 AM
08/31/2016
   4:00 PM
 Harney Road E. Sligh Avenue US Highway 301 Trim tres for Tampa Electric 07/27/2016
    9:00 AM
09/30/2015
       4:00 PM
 EXTENSION
Hickman Street
 7th Street Railroad Street Sidewalk Installation  05/02/2016
    8:00 AM
08/26/2016
   5:00 PM
 Highview Road At Creek Bend Drive Bayouview Drive Stillview Circle Replace Poles 06/27/2016
   8:00 AM
08/31/2016
   4:00 PM
 EXTENSION
Hillsborough Street
7th Street 4th Street  Sidewalk Installation 05/02/2016
   8:00 AM
08/26/2016
   5:00 PM
 N. Himes Avenue W. Broad Street  W. Hamilton Avenue Replace driveway pipe 07/26/2016
   9:00 AM
07/29/2016
   4:00 PM
 Jasmine Creek Court Cul De Sac Cul De Sac Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
 Jean Street Maple Lane Dead End Trim trees for Tampa Electric 07/27/2016
  8:00 AM
09/30/2016
   5:00 PM
 Keene Road W. Knights Griffin Road McGee Road Ditch Cleaning 07/05/2016
  8:00 AM
07/27/2016
   5:00 PM
 Kings Avenue S. W. Lumsden Road Tradewinds Drive Replace Poles 06/27/2016
   9:00 AM
07/27/2016
   4:00 PM
 King Leon Way Regal Manor Way Cul De Sac Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
 2618 S. Kingsway Road Cherry Laurel Street Ball Park Avenue Tree trimming  and structural pruning, MOT 07/26/2016
   9:00 AM
07/27/2016
   4:00 PM
 Kingswood Drive 23rd Avenue Dead End Installation of 2" HDPE Water Main 05/09/2016
   8:00 AM
01/07/2017
   5:00 PM
 INTERSECTION of Kinnan Street and Cross Creek Boulevard      We are adding a left turn lane on Cross Creek Boulevard and a right turn lane on Kinnan 07/05/2016
  9:00 PM
10/31/2016
   5:30 AM
 Knights Gate Court Nobel Fair Drive Cul De Sac Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
 Kirkwood Drive Twelve Oaks Boulevard Edenbrook Court Repair Service/Main 07/18/2016
   8:00 AM
08/15/2016
   5:00 PM
 Lagoon Street Troydale Road Dead End Replace Valve  07/18/2016
   8:00 AM
08/18/2016
   5:00 PM
 Lake Hills Drive Donnymoor Drive Silver Pines Drive Storm Water Improvements/Culvert Replacement  07/20/2016
   8:00 AM
12/04/2016
   5:00 PM
 Lake Magdalene Boulevard Cherry Brook Lane Cherry Creek Drive Place Water Main 6" 06/20/2016
  9:00 AM
07/30/2016
   4:00 PM
 Lakewood Drive W. Brandon Boulevard Lake Meadow Circle S. Installing Over Head Equipment  07/25/2016
   9:00 AM
08/25/2016
   4:00 PM
 Lanway Drive Morris Bridge Rd Dead End Trim trees for Tampa Electric 07/27/2016
    8:00 AM
09/30/2016
    5:00 PM
 Leisure Place E. 131st Avenue E. 132nd Avenue Trim trees for Tampa Electric 07/18/2016
   8:00 AM
08/29/2016
  5:00 PM
Lenox Greens Drive Crystal Greens Drive Platinum Drive Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
5:00 PM
EXTENSION
W. Linebaugh Avenue
Sheldon Road Angus Drive Turn Lanes And ROW Work For Costco 03/28/2016
9:00 AM
08/15/2016
3:30 PM
 Lithia Pinecrest Road Lithia Ridge Boulevard Erindale Drive Pole Replacements 06/04/2016
   9:00 AM
08/04/2016
   4:00 PM
 Livingston Avenue Priscilla Court Derby Glen Drive Installation of Residential Drive 07/18/2016
  9:00 AM
07/29/2016
  4:00 PM
 W. Longboat Boulevard W. Hillsborough Avenue Harborbluff Way Install and maintain temporary bypass pump and piping, Excavate, locate, and repair existing 10" sewer pipe 07/26/2016
   8:00 AM
08/05/2016
   5:00 PM
E. Lumsden Road Barrington Drive Giggleswick Lane Rehabilitation of lift station-close eastbound lane if necessary for delivery of equipment and materials 05/02/2016
9:00 AM
08/08/2016
4:00 PM
 W. Lutz Lake Fern Road Angel Lane Sun Coast Parkway Install lightning arrester 07/11/2016
   9:00 AM
8/11/2016
   4:00 PM
 Magnolia Landing Court W. Del Webb Boulevard Cul De Sac Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
EXTENSION
 Mango Road
I-4 Pruett Road Road Widening And Utility Construction  03/30/2015
   8:30 AM
09/01/2016
   5:00 PM
 Maple Lane Wilkins Road E. Sligh Avenue Bridge/Guardrail Repairs Br#100369 07/25/2016
   8:00 AM
08/25/2016
    5:00 PM
 Mapledale Boulevard Dale Mabry Highway Northdale Boulevard Resurface Roadway  07/11/2016
   9:00 AM
07/29/2016
  4:00 PM
 Martin Lane N. 53rd Street Dead End Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Meadow Lark Lane W. Del Webb Boulevard Bentwood Drive Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
Misty Greens Drive Cul De Sac Platinum Drive Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
 5:00 PM
EXTENSION 
S. Moon Avenue
Oakfield Drive Robertson Drive Storm-water culvert replacement 05/31/2016
   8:00 AM
08/26/2016
   5:00 PM
 Morris Bridge Road Harney Road Mc Rae Road Trim trees for Tampa Electric 07/27/2016
   9:00 AM
09/30/2016
    4:00 PM
 Morris Bridge Road Rockridge Circle Idlewood Drive Replace Power POles 07/19/2016
   8:00 AM
08/02/2016
  5:00 PM
 Muck Pond Road McIntosh Road Indian Hollow Trail Bridge/Guardrail Repairs Br#104442 07/25/2016
   8:00 AM 
08/25/2016
   5:00 PM
Myrtle Vista Court Emerald Dunes Drive Cul De Sac` Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
5:00 PM
 Navajo Avenue Raulerson Ranch Road Dead End Trim trees for Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
   5:00 PM
New Bedford Drive South Pebble Beach Boulevard South Pebble Beach Boulevard Inlet top replacement 04/06/2016
8:00 AM
10/04/2016
5:00 PM
 Nobel Fair Drive Emerald Dunes Drive Cul De Sac Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
Noble Faire Drive Emerald Dunes Drive Jasmine Creek Court Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
5:00 PM
Northdale Boulevard Dawnview Drive East Course Drive 1. RWM on eastbound lane requiring outside lane closure to Woodlark Drive 2. Intersection of Woodlark Drive, two inside lanes and turn lanes on Northdale closed, traffic still has two outside lanes each direction, 3. Westbound lane from Woodlark to East Course, outside lane closed. 11/19/2015
9:00 AM
08/11/2016
4:00 PM
 Olive Jones Road Gunn Highway Arlingtopn Creek Lane Replace Power Poles 07/19/2016
  8:00 AM
07/29/2016
  5:00 PM
EXTENSION
 Old Linebaugh Avenue
Sheldon Road W. Linewbaugh Avenue  Final Asphalt And ROW Work For Costco 03/15/2016
   9:00 AM
08/15/2016
  4:00 PM
 Oran Street E. Diana Street E. Hanna Avenue Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Orient Road E. Sligh Avenue Dead End Trim trees for  Tampa Electric 07/27/2016
   8:00 AM
09/30/2016
   5:00 PM
 S. Pebble Beach Drive Emerald Dunes Drive Via Toscana Way Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
Peridot Lane Cul De Sac New Bedford Drive Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
5:00 PM
 Pittsfield Avenue Lowell Road Northern Dead End Installation of 20' RCW + 24" FM for DMD Project 07/25/2016
   8:00 AM
08/26/2016
    5:00 PM
Platinum Drive New Bedford Drive Signature Drive Inlet top replacement 04/06/2016
8:00 AM
10/04/2016
5:00 PM
 E. Pocahontas Avenue N. 50th Street N. 47th Street Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
Preservation Green Court Villeroy Drive Villeroy Drive Inlet top replacement 04/06/2016
8:00 AM
10/04/2016
 5:00 PM
 Puritan Road Whittier Street N. 56th Street Instalation of Fire Protection Improvements in accordance with CIP 31957 06/06/2016
   8:00 AM
07/30/2016
   5:00 PM
 Regal Manor Way Emerald Dunes Drive Cul De Sac Inlet Top Replacement 05/16/2016
   8:00 AM
10/04/2016
   5:00 PM
Regal Manor Way Emerald Dunes Drive Noble Faire Drive Inlet top replacement 04/06/2016
8:00 AM
10/04/2016
5:00 PM
 Reindeer Road Wishing Well Way Lancelot Loop Replace Stub Pole  07/25/2016
   8:00 AM
08/25/2016
   5:00 PM
 Roble Grove Court Wildwood Oak Drive Dead End Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Rockhill Road Jackson Road Dead End Lines Clearance  06/30/2016
   8:00 AM
07/28/2016
   5:00 PM
 Rowan Lane Tifton Drive Dead End  Replace blow off Valve 07/22/2016
   8:00 AM
07/30/2016
   5:00 PM
Royal Links Court Platinum Drive Cul De Sac Inlet top replacement 04/06/2016
 8:00 AM
10/04/2016
5:00 PM
 Sandstone Court Pebble Drive End of Sandstone Court (south) Storm Drainage Improvements 07/21/2016
   8:00 AM
09/21/2016
   5:00 PM
EXTENSION
Sheldon Road
Old Linebaugh Avenue Linebaugh Avenue Turn Lanes And ROW Work For Costco 03/28/2016
8:30 PM
08/15/2016
5:30 AM
Signature Drive Cul De Sac Platinum Drive Inlet top replacement 04/06/2016
8:00 AM
10/04/2016
5:00 PM
 E. Sligh Avenue N. 53rd Street N. 56th Street Lining Sanitary Sewers In ROW Easement 07/20/2016
  9:00 AM
09/01/2016
   4:00 PM
 E. Sligh Avenue US Highway 301 Harney Road Trim trees for Tampa Electric 07/27/2016
  9:00 AM
09/30/2016
   4:00 PM
 EXTENSION
E. Sligh Avenue
Mango Road Black Dairy Road Road Widening And Utility Construction  03/30/2015
    8:30 AM
09/01/2016
    5:00 PM
 Spring Valley Drive W. Crenshaw Street Elizabeth Lane Storm Drainage Improvements 07/27/2016
   8:00 AM
09/21/2016
    5:00 PM
 Stillbrook Avenue Memorial Highway Stolls Avenue Curb and gutter repair and asphalt patch 07/21/2016
   8:00 AM
08/21/2016
  5:00 PM
DATES REVISED
Sydney Road
Neal Acres Road Caruthers Road Adjacent Railroad Trestle Replacement 05/16/2016
9:00 AM
09/02/2016
4:00 PM
 Tarpon Drive Snapper Street Snapper Street Desilt & CIPP Existing Elip RCP 07/25/2016
  8:00 AM
09/30/2016
   5:00 PM
 Troydale Road Lagoon Street Dead End Trimming trees 07/18/2016
  8:00 AM
07/29/2016
  5:00 PM
TIME REVISED 
Turkey Creek Road
State Road 60 Keysville Road Mill & Resurfacing 06/13/2016
8:30 AM
08/29/2016
    5:00 PM
TIME REVISED 
N. Turkey Creek Road
US 92 US 574 Mill & Resurfacing 05/30/2016
8:30 AM
08/29/2016
   5:00 PM
 Universal Drive Garon Avenue Metro Drive Replace (1) Pole 07/25/2016
   8:00 AM
08/05/2016
   5:00 PM
 S. Valrico Road State Road 60 E. Crown Park Drive Installation of new sidewalk  07/25/2016
    9:00 AM
09/09/2016
   4:00 PM
 Venetian Way Dana SHores Drive Venetian Way (south) Storm Drainage Improvements 07/21/2016
   8:00 AM
09/21/2016
   5:00 PM
 Victoria Woods Drive W. Del Webb Boulevard Gardenia Landings Lane Inlet top replacement 07/05/2016
   8:00 AM
10/04/2016
   5:00 PM
 Villeroy Drive Preservation Green Court Platinum Drive Inlet top replacement 04/06/2016
   8:00 AM
10/04/2016
    5:00 PM
 Waltham Avenue Salem Street Southern Dead End Installation of 20' RCW + 24" FM for DMD Project 07/25/2016
   8:00 AM
09/02/2016
   5:00 PM
 Waters Avenue  Benjamin Road Hanley Road Clean Storm Water Pipes For T.V. Inspection  06/11/2016
   9:00 AM
08/28/2016
   4:00 PM
 Waters Avenue Dale Mabry Highway Manhattan Avenue Clean Storm Water Pipes For T.V. Inspection 06/11/2016
   9:00 AM
08/28/2016
   4:00 PM
 Waters Avenue Hanley Road Sheldon Road Clean Storm Water Pipes For T.V. Inspection 06/11/2016
   9:00 AM
08/28/2016
   4:00 PM
 Waters Avenue Manhattan Avenue Benjamin Road Clean Storm Water Pipes For T.V. Inspection 06/11/2016
  9:00 AM
08/28/2016
   4:00 PM
Waters Avenue Woodland Corporate Boulevard Dale Mabry Highway Proposed Fiber Optic Cable Pull In Existing Conduit System 04/01/2016
8:00 AM
08/01/2016
5:00 PM
 Wayne Road Willow Lake Drive Simms Road Extend Primary, Upgrade Poles 07/25/2016
   8:00 AM 
 08/25/2016
    5:00 PM
 Webb Road Forest Haven Court W. Hanna Avenue Install Equipment On Poles  07/25/2016
   8:00 AM
08/25/2016
   5:00 PM
 Webb Road at Hillsborough Avenue Hillsborough Avenue Civic Road Paving Operation Closing Webb Road South of Hillsborough Avenue Night Time Closer Only 8:00 PM to 6:00 AM 07/31/2016
    8:00 PM
08/04/2016
   6:00 AM
Webb Road Tanglewood Lane Forest Haven Circle Intersection improvements, including but not limited to drainage, excavation, milling and paving, tree removals and sodding 02/01/2016
9:00 AM
12/31/2016
4:00 PM
 Wiggins Road Larry Kelley Lane Cason Road Bridge/Guardrail Repairs Br#104434 07/25/2016
   8:00 AM
08/25/2016
   5:00 PM
 EXTENSION
Wilcox Road
Hatton Road Bonnyvale Way Intermittent lane closures to support the construction of the substructure and provide  safe passage for traffic 06/20/2016
   8:00 AM
07/31/2016
   4:00 PM
 Wildwood Oak Drive E. Sligh Avenue Dead End Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 Windhorst Road at Kingsway Road Kingsway Road Seffner Valrico Road Proposed turn lane, curb, sidewalk, swell work 07/25/2016
   8:00 AM
08/08/2016
   5:00 PM
 Woodberry Road Essex Road Grand Regency Boulevard Tree trimming and structural pruning, MOT 07/28/2016
   9:00 AM
07/29/2016
   4:00 PM
 Woodfield Drive Roberta Lane Dead End Tree trimming over Road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
Woodland Center Boulevard Bald Cypress Place Woodland Corporate Boulevard Proposed Fiber Optic Cable Pull In Existing Conduit System 04/01/2016
8:00 AM
08/01/2016
5:00 PM
Woodland Corporate Boulevard Woodland Center Boulevard Waters Avenue Proposed Fiber Optic Cable Pull In Existing Conduit System 04/01/2016
8:00 AM
08/01/2016
5:00 PM
 Wrenwood Circle N. 53rd Street N. 53rd Street Tree trimming over road & R.O.W. 07/26/2016
   8:00 AM
08/31/2016
   5:00 PM
 TIME REVISED
Zambito Road
 Bears Avenue Dale Mabry Highway Reconstruction of Roadway 06/06/2016
  8:00 PM
09/01/2016
   5:00 AM