|
|
|
|
|
|
Hillsborough County recommends that if you are using a dial-up internet service provider,
that you right-click once on the link and select "save as" when trying to access any file over 200KB. |
| |
This section contains information on projects recommended for funding in the County’s Utility System. You can open or
download the entire file by visiting the program title or you can open or download sections by visiting
any of the highlighted titles in the project detail section below.
|
| |
- Water Services ( PDF, 3593KB )
- Sources and Uses of Funds and, Completed Projects, and Projects Summary Schedule ( PDF, 218KB )
- Project Detail (in alphabetical order by sub-program)
- Water
- Wastewater
- Apollo Beach 16 Force Main through Boyette / Balm Riverview Road Master Repump ( PDF, 108KB )
- Brandon Lakes Force Main Replacement through Countywide Major WWTP Overhaul Projects ( PDF, 182KB )
- Countywide Master Transmission System Fare Account through Dale Mabry AWTP Process and Telemetry Upgrade ( PDF, 202KB )
- Dale Mabry Odor Control Equipment Replacement through Low Pressure Sewer System ( LPSS ) Master Project ( PDF, 147KB )
- Manhole Inspection and Rehabilitation Program through Northwest Residuals System and Process Telemetry Upgrades ( PDF, 189KB )
- Northwest Sludge Holding Tanks Recoating / Relining through Rhodine Road/Balm Riverview Road Parallel Force Main ( PDF, 171KB )
- River Oaks Awtp Power Distribution Reconfigure through State Road 60 12 Inch Parallel Force Main ( PDF, 209KB )
- State Road 60 and Falkenburg Road Force Main Improvements through US 41 Symmes Avenue Wastewater Force Main ( PDF, 188KB )
- Valrico Awtp Additional Sludge Holding Tank through Valrico Hills Franchise Purchase and Wastewater Connection ( PDF, 165KB )
- Van Dyke Plant to NWRWRF Transfer Force Main through Wastewater Line, Manhole, and Valve Condition Assessment ( PDF, 167KB )
- Wastewater Slip Lining Master Project through Woodberry Pump Station Expansion ( PDF, 97KB )
- Reclaimed Water
|
|
|