Schedule of Reported Lane Closures For County Roads
 
The following Hillsborough County Roads are those where permits have been granted for scheduled closure.
  • This list is in Road name sequence.
  • ** Indicates date extension.
View Road Closures  
 
We regret any inconveniences that these road closings and lane closings may cause.
Last updated on September 3, 2008 10:30 AM
 
Lane Closures or Realignments
Road Name From To Reason Closed From Closed To Comments Critical
24th Avenue 70th Street 66th Street Tree Trimming/Power Lines 08/28/2008 8:30 am 09/26/2008 5:00 pm Clair-Mel Area No
36th Avenue 66th Street Dead End Tree Trimming/Power Lines 08/28/2008 8:30 am 09/26/2008 5:00 pm Clair-Mel Area No
4th St SW Woodland Estates Ave US 41 Install Forcemain 08/11/2008 9:00 am 10/11/2008 5:00 pm Ruskin Area No
54th Street Causeway Blvd 24th Avenue Tree Trimming/Power Lines 08/28/2008 8:30 am 09/26/2008 5:00 pm Clair-Mel Area No
Beverly Drive E. Sylvan Dr W. Sylvan Dr. Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Bruce B Downs Blvd Cypress Preserve Dr Compton Dr Construct Entrance into Church 08/18/2008 9:00 am 09/18/2008 5:00 am New Tampa Area No
Bruce B Downs Blvd Cypress Preserve Dr Methodist Place Install Turn Lanes 08/18/2008 9:00 pm 09/18/2008 5:00 am New Tampa Area No
Carolyn Drive East Sylvan Drive West Sylvan Drive Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Cornwall Lane El Dorado Dr Town 'N Country Blvd Install Pipe for City of Tampa Water 07/23/2008 8:30 am 11/26/2008 5:00 pm Town 'N Country Area No
County Line Road Dale Mabry Hwy Deer Lake Rd Reconstruct Ent. to Target & Turn Lane Improvem 08/12/2008 9:00 am 09/19/2008 4:00 pm Lutz Area No
Downing Street Hare Family Lane South Dover Road Tree Trimming 08/07/2008 8:30 am 09/11/2008 5:00 pm Dover Area No
Durant Road Joe Davis Road School House Lane Bridge Replacement 08/22/2008 9:00 am 06/18/2009 4:00 pm Durant Area No
Early Gold Lane Hackney Drive Marsanne Place Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Riverview Area No
El Dorado Dr Tanglewood Lane Cornwall Lane Install Pipe for the City of Tampa Water Dpt 07/23/2008 8:30 am 11/26/2008 5:00 pm Town 'N Country Area No
English Bluffs Court Providence Lakes Blvd To Its End Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Brandon Area No
Green Cove Dr Valley Hill Dr Stone Dr Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Valrico Area No
Gunn Hwy S. Mobley Road Keystone Crossing Replace Poles 09/02/2008 9:00 am 10/02/2008 4:00 pm Keystone Area No
Hackney Drive Krycul Avenue U.S. Hwy 301 Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Riverview Area No
Hanley Road Barry Road Waters Avenue Trim Tree/Power Lines 09/02/2008 9:00 am 10/02/2008 4:00 pm Town 'N Country Area No
Highview Road Park Avenue MLK Blvd Tree Trimming/Power Lines 08/28/2008 9:00 am 09/26/2008 4:00 pm Mango Area No
Hillpoint Way Hillrise Dr Valley Hill Dr Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Hummingbird Lane Bell Shoals Road Henchee Lane Install 4 Inch Gas Line 08/25/2008 9:00 am 09/05/2008 4:00 pm Brandon Area No
Kelly Rd Memorial Hwy Winchester Dr Rdway Reconstruction 07/28/2008 9:00 am 11/06/2008 4:00 pm Town 'N Country Area No
Kings Ave Kings Ave Victoria St Intersection Improvements 07/24/2008 9:00 am 12/31/2008 4:00 pm Brandon Area No
Kings Ave Kings Ave Providence Lakes Intersection Improvements 07/24/2008 9:00 am 12/31/2008 4:00 pm Brandon Area No
Kingsway Road Hedgerow Road Holly Lane Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Krycul Avenue Lakes St Charles Place Hackney Drive Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Riverview Area No
Lake Magdalene Blve Bearss Ave North Blvd S/W Imp. Repair & Replacement 07/28/2008 9:00 am 03/31/2009 4:00 pm Lk Magdalene Area No
Lake St Charles Blvd Krycul Avenue Gray Oak Place Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Riverview Area No
Ledgstone Drive Providence Lakes Blvd Summer Breeze Dr. Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Brandon Area No
Lowell Road Lowell Rd Rolling Green Lane Install Left Turn Lane 08/13/2008 9:00 am 09/12/2008 4:00 pm Carrollwood Area No
Madison Avenue Joanne Kearney Blvd Eagle Falls Construct Entrance to Driveway 08/18/2008 9:00 am 09/19/2008 4:00 pm Progress Village Area No
Marsanne Place Early Gold Lane To Its End Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Riverview Area No
Memorial Hwy George Rd Anchor Plaza Pkwy Installation of Turn Lanes 09/02/2008 9:00 am 10/31/2008 4:00 pm Town 'N Country Area No
Murray Hill Dr Tanglewood Lane Cornwall Lane Install Pipe for City of Tampa Water 07/23/2008 8:30 am 11/26/2008 5:00 pm Town 'N Country Area No
N. Sylvan Dr E. Sylvan Dr W. Sylvan Dr Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Oak Ridge Drive Oak Ridge Court Rain Bow Trail Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Area No
Oakwood Avenue Morgan Street Lodge Install Watermain 08/14/2008 8:30 am 10/31/2008 5:00 pm Brandon Area No
Providence Lakes Blvd. Ledgestone Drive English Bluffs Court Underground Utility 02/05/2008 9:00 am 02/05/2009 4:00 pm Brandon Area No
Racetrack Road Lafayette Blvd Dead End Install Wastewater Force Main 06/30/2008 9:00 am 12/30/2008 4:00 PM Odessa Area No
Seffner Valrico Road Ravenwood Dr Valrico Lk Rd Install Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Valrico Area No
South Sylvan Drive East Sylvan Drive West Sylvan Drive Install of Fire Hydrants & Watermain 07/01/2008 9:00 am 10/03/2008 4:00 pm Mango Drive No
Sydney Dover Road Walden Sheffield Road MLK Blvd. Tree Trimming 08/07/2008 8:30 am 09/11/2008 5:00 pm Dover Area No
Tanglewood Lane El Dorado Dr Town 'N Country Blvd Install Pipe - City of Tampa Water 07/23/2008 8:30 am 11/26/2008 5:00 pm Town 'N Country Area No
Thonotosassa Rd Taylor Rd Baker Creek Park Installing Sidewalk 07/01/2008 8:30 am 01/01/2008 5:00 pm Thonotosassa Area No
W Elm Street Rosewood Court Eldorado Court Pump Station Repairs 08/11/2008 9:00 am 11/26/2008 4:00 pm Town 'N Country Area No
Waters Avenue Sheldon Road Hanley Road Trim Tree/Power Lines 09/02/2008 9:00 am 10/02/2008 4:00 pm Town 'N Country Area No
Wheeler Road Lenna Ave Seffner Valrico Rd Watermain Installation 06/24/2008 9:00 am 12/31/2008 4:00 pm Brandon Area No
Windermere Way 12th Ave 16th Ave Remove & Replace Speed Humps 09/08/2008 8:00 am 10/10/2008 5:00 pm Clair-Mel Area No
Woodland Estates Ave College Ave US 41 Install Watermain 08/11/2008 9:00 am 10/11/2008 5:00 pm Ruskin Area No
Back to Top
 


Hillsborough County is an Equal Opportunity/Affirmative Action Employer

For Spanish speakers, please review the Spanish Translation Disclaimer before using the translation service.
For all other language speakers, please review the Standard Translation Disclaimer, which will translate to the language the user selects.

Hillsborough County Seal
Copyright 2008 | HIPAA Information | Legal Information | Translation Notice