The document on this web site
does not contain signatures, Rules for Discovery in Arbitration,
or the Master Water Supply Contract. To view those documents, please
visit the Water Resource Team office at 705 E. Kennedy Blvd. during
normal business hours.
THIS AMENDED AND RESTATED INTERLOCAL AGREEMENT is
made and entered into as of May 1, 1998, by and among Hillsborough
County, a political subdivision of the State of Florida; Pasco County,
a political subdivision of the State of Florida; Pinellas County,
a political subdivision of the State of Florida; the City of St.
Petersburg, a municipal corporation of the State of Florida; the
City of Tampa, a municipal corporation of the State of Florida; and
the City of New Port Richey, a municipal corporation of the State
of Florida.
W I T N E S S E T H:
WHEREAS, the West Coast Regional Water Supply
Authority (the "Authority") was created pursuant to an Interlocal
Agreement among Hillsborough County, Pasco County, Pinellas County,
the City of St. Petersburg, and the City of Tampa dated October 24,
1974, for the purpose of developing, recovering, storing and supplying
water for county and municipal purposes in such a manner as will
give priority to reducing adverse environmental effects of excessive
or improper withdrawals of water from concentrated areas; and
WHEREAS, the Authority is presently operating
under an "entitlement" or "subscription" approach to funding its
operations, producing water from existing water supply facilities
and developing new water supply facilities, resulting in rate differentials,
varying entitlements and other divergent interests among the parties,
and
WHEREAS, pursuant to the provisions of Sections
373.1962 and 163.01, Florida Statutes, the parties desire to establish
the terms under which the Authority will be reorganized to eliminate
rate differentials, varying entitlements and other divergent interests,
thus more effectively enabling the Authority to accomplish its goals
and purposes, as set forth in Sections 373.1962 and 163.01, Florida
Statutes; and
WHEREAS, the Authority will be reorganized pursuant
to this Amended and Restated Interlocal Agreement, which will become
effective upon satisfaction of certain specific conditions set forth
herein;
NOW THEREFORE, in consideration of
the premises set forth above and the covenants, obligations, duties
and benefits herein set forth, and other valuable consideration,
the receipt and sufficiency of which are hereby conclusively acknowledged,
the parties hereto agree as follows:
ARTICLE I
INTRODUCTION
SECTION 1.01. DEFINITIONS. When
used in this Agreement, the following terms shall have the following
meanings, unless the context clearly requires otherwise:
(A) "Aquifer Storage and Recovery" means the
process of injecting, storing and recovering Water from aquifer
systems.
(B) "Actual Direct Cost" means (1) with respect to the acquisition
of Water Supply Facilities, the total capital cost of acquiring and constructing
such Water 2 Supply Facilities, excluding any indirect cost; and (2) with
respect to Water treatment, the total capital and operating cost of providing
such treatment, excluding any indirect cost.
(C) "Agreement" means this Amended and Restated Interlocal
Agreement, including any amendments or supplements hereto executed and delivered
in accordance with the terms hereof.
(D) "Allocated Overhead" means, as to any Water Supply Facility,
that portion of the Overhead that is allocated to the Water Supply Facility
by (1) dividing (a) the estimated quantity of Quality Water to be pumped
or produced during the Fiscal Year at the Water Supply Facility by (b) the
total estimated quantity of Quality Water to be pumped or produced during
the Fiscal Year at all Water Supply Facilities owned or operated by the Authority,
and (2) multiplying the result by the Overhead.
(E) "Authority" means the West Coast Regional Water Supply
Authority, an interlocal governmental agency created and existing pursuant
to Sections 373.1962 and 163.01, Florida Statutes, and an Interlocal Agreement
among Hillsborough, Pasco, Pinellas, St. Petersburg and Tampa dated October
25, 1974, as amended, supplemented and restated pursuant to this Agreement.
(F) "Authority/Hillsborough Transfer Agreement" means the
agreement attached hereto as Appendix 1, pursuant to which the Authority
will convey treatment and transmission facilities to Hillsborough.
(G) "Authority/Pasco Transfer Agreement" means the agreement
attached hereto as Appendix J, pursuant to which the Authority will convey
transmission facilities to Pasco.
(H) "Authority/Tampa Transfer Agreement" means the agreement
attached hereto as Appendix K, pursuant to which the Authority will convey
transmission facilities to Tampa.
(1) "Board" means the Authority's Board of Directors, appointed pursuant
to Section 2.03 hereof.
(I) "Consolidated Permit" means a single Primary
Environmental Permit
that includes multiple Water Supply Facilities that are located within the
jurisdiction of different Member Governments.
(K) "Contributing Area" means the area surrounding
a ground Water withdrawal facility from which Water is contributed
to that facility under typical operation by means of infiltration
from the land surface to the ground Water system from which such
withdrawal is made.
(L) "Desalination Facilities" means facilities designed
to treat Water with total dissolved solids exceeding 10,000 milligrams per
liter.
(M) "Director" means an individual appointed to the Board
by a Member Government pursuant to Section 2.03 hereof.
(N) "Disinfection Credit" means the stipulated treatment
credit amount payable to each Member Government conveying Transferred Assets
to the Authority pursuant to Sections 5.01, 5.02, 5.03, 5.04, 5.05 and 5.06
hereof.
(0) "Economic Impact Facilities" means Water Supply Facilities
owned by the Authority and not subject to ad valorem taxation that have an
adverse economic impact on the Member Government in whose jurisdiction they
are located by (A) removing property suitable for industrial use from the
ad valorem tax roll or (B) requiring significant annual expenditures of public
funds by the Member Government. The term "Economic Impact Facilities" includes
Desalination Facilities, but excludes wellfields, reservoirs, Water treatment
facilities comparable to those heretofore operated by the Authority or the
Member Governments, and Water transmission facilities.
(P) "Environmental Permit" means all permits, licenses,
or other third-party approvals necessary for the acquisition, construction
or operation of an Authority Water Supply Facility, including but not limited
to Primary Environmental Permits.
(Q) "EPC" means the Hillsborough County Environmental Protection
Commission, a governmental agency created by special act of the Florida Legislature.
(R) "EPC Agreement" means the agreement attached hereto
as Appendix L.
(S) "Existing Authority System" means the Water Supply Facilities
owned by the Authority on the date hereof.
(T) "Financing Documents" means any resolution or resolutions
of the Authority, as well as any indenture of trust, trust agreement or similar
document relating to the issuance or security of the Obligations.
(U) "Fiscal Year" means the period commencing on October
1 of each year and continuing through the next succeeding September 30, or
such other period as may be prescribed by law as the fiscal year for the
Authority.
(V) "Full Implementation Date" means (1) October 1, 1998-
provided however, that if the Department of Environmental Protection has
entered a final order 5 approving this Agreement and administrative hearings
or appellate proceedings therefrom have been commenced, the "Full Implementation
Date" shall be deferred to the date ninety days following the conclusion
of all such administrative hearings or appellate proceedings or (2) such
later date as the Board may approve by unanimous vote pursuant to Section
6.03(E) hereof.
(W) "General Counsel" means the chief legal officer of the
Authority.
(X) "General Manager" means the chief executive staff officer
of the Authority.
(Y) "Governmental Obligations" means (1) direct and general
obligations of the United States of America, or those which are unconditionally
guaranteed as to principal and interest by the United States of America (the "Defeasance
Obligations"), and (2) pre-refunded municipal obligations (obligations of
any state of the United States of America or of any agency, instrumentality,
political subdivision or local government unit of such state) meeting the
following criteria:
(a) the municipal obligations must be rated "AAA" by
Standard and Poor's Corporation and "Aaa" by Moody's Investors
Service, Inc. and may not be callable prior to maturity or, alternatively,
the trustee or escrow agent for such obligations has received irrevocable
instructions concerning their calling and redemption"
(b) the municipal obligations are secured by cash and/or
Defeasance Obligations which may be applied only to principal,
interest and premium payments of such municipal obligations;
(c) the principal and interest of the Defeasance Obligations
(plus any cash in the fund) has been verified by a nationally recognized
firm of independent certified public accountants as sufficient
to pay the principal, interest and premium, if any, of the municipal
obligations;
(d) the Defeasance Obligations serving as security for
the municipal obligations must be held by an escrow agent or a
trustee, and
(e) the Defeasance Obligations are not available to
satisfy any other claims, including those of the trustee or escrow
agent.
(Z) "High Flow Periods" means those periods during
which the flow in the Hillsborough River, as measured at the Hillsborough
River Reservoir dam, exceeds the flow required by environmental regulations.
(AA) "Hillsborough" means Hillsborough County, a political
subdivision of the State.
(BB) "Hillsborough Bay Resource Exchange Project" means the
TWRRP and the Authority's proposed withdrawal facilities on the Tampa Bypass
Canal and the surface water treatment plant required to treat the purified
water and deliver it to the Member Governments.
(CC) "Hillsborough River Reservoir" means the run of the Hillsborough
River between Fletcher Avenue and the Hillsborough River Reservoir dam.
(DD) "Hillsborough Transfer Agreement" means the agreement
attached hereto as Appendix G, pursuant to which Hillsborough will convey
Transferred Assets to the Authority.
(EE) "Host Member Government" means any Member Government
in whose jurisdiction the Authority seeks issuance, modification or renewal
of a Primary Environmental Permit- provided however, that the term "Host
Member Government" also includes Tampa (1) with respect to Primary Environmental
Permits for Cone Ranch and Dispersed Wells, Cypress Bridge Wellfield, Hillsborough
River High Water and the Tampa Bypass Canal, and (2) under the circumstances
described in Section 3.08 hereof. If SWFWMD issues a Consolidated Permit,
any Member Government shall qualify as a "Host Member Government" for the
limited purpose of raising environmental issues affecting property located
within its own jurisdiction.
(FF) "Master Water Plan" means the Authority's plan for
expansion, conservation, diversification and preservation of Water supply
for the Water Service Areas (as defined in the Master Water Supply Contract),
as the same may be amended or superseded from time to time.
(GG) "Master Water Supply Contract" means the agreement
attached hereto as Appendix B between the Authority and each Member Government,
pursuant to which the Member Government purchases Quality Water from the
Authority.
(HH) "Member Governments" means Hillsborough, Pasco, Pinellas,
New Port Richey, St. Petersburg and Tampa.
(II) "New Port Richey" means the City of New Port Richey,
a municipal corporation of the State.
(JJ) "New Port Richey Transfer Agreement" means the agreement
attached hereto as Appendix H, pursuant to which New Port Richey will convey
Transferred Assets to the Authority.
(KK) "Net Utility Revenue" means the net revenue of each
Member Government's water system or, if a Member Government's water and wastewater
systems have been combined for financing purposes, the net revenue of the
combined water and wastewater system remaining after payment of operating
expenses and debt service due on obligations secured by such revenue.
(LL) "Obligations" means a series of bonds or other evidence
of indebtedness including but not limited to, notes, commercial paper, capital
leases or any other obligations of the Authority heretofore or hereafter
issued or incurred.
(MM) "Overhead" means the administrative and general expenses
of the Authority that are not directly attributable to ownership and operation
of any specific Water Supply Facility, as established in the approved annual
budget.
(NN) "Partnership Plan Wellfields" means Cross Bar Ranch
Wellfield, Cypress Creek Wellfield, Starkey Wellfield, North Pasco wellfield,
South Pasco Wellfield, Eldridge-Wilde wellfield, Cypress Bridge wellfield,
Cosme-Odessa Wellfield, Section 21 wellfield, Northwest Hillsborough Regional
Wellfield, and Morris Bridge wellfield.
(00) "Pasco" means Pasco County, a political subdivision
of the State.
(PP) "Pasco Transfer Agreement" means the agreement attached
hereto as Appendix F, pursuant to which Pasco will convey Transferred Assets
to the Authority. (QQ) "Pinellas" means Pinellas County, a political subdivision
of the State.
(RR) "Pinellas Transfer Agreements" means the agreements
attached hereto as Appendices D-1 and D-2, pursuant to which Pinellas will
convey Transferred Assets to the Authority.
(SS) "Pledged Funds" means (1) the revenues, fees, charges
and other moneys received by the Authority relating to the ownership or operation
of its Water Supply Facilities, and (2) until applied in accordance with
the terms of the Financing Documents, all moneys in the funds and accounts
established thereby, including investments therein: in each case to the extent
provided by the Board pursuant to the Financing Documents.
(TT) "Points of Connection" means the points identified
pursuant to the Master Water Supply Contract, as revised by the Authority
and the Member Governments from time to time, at which the Member Governments'
water utility systems connect to the Authority's system.
(UU) "Primary Environmental Permit" means the issuance,
modification or renewal of a consumptive use permit, an environmental resource
permit, a permit from the Department of the Army under Section 404 of the
Federal Clean Water Act, or a national pollutant discharge elimination system
permit for a waste stream discharge from a water treatment plant to surface
waters (or the successor in function to any of such permits), for which the
Authority applies as sole permittee or as co-permittee. The term "Primary
Environmental Permit" also includes application for SWFWMD approval of any
Wellfield Operations Plan, other water production optimization plan, or environmental
management plan (or their successor in function) required by SWFWMD. With
respect to any Wellfield Operations Plan or other water production optimization
plan, the term "Primary Environmental Permit" includes only those modifications
to the Wellfield Operations Plan or other water production optimization plan
that affect the methods, variables or parameters of the Wellfield Operations
Plan and materially change the quantity of Replacement Capacity and Rotational
Capacity applied to reduce the withdrawal of Water from various Authority
wellfields.
(VV) "Production Failure" means (1) the occurrence of a
Shortfall, provided however, that a Shortfall that results from a mechanical,
equipment or other facility failure shall not constitute a "Production Failure," or
(2) following December 31, 2002, the actual delivery by the Authority to
the Member Governments during any twelvemonth period of a quantity of Quality
Water that exceeds 94 percent of the aggregate permitted capacity of the
Authority's production facilities on an average annual basis, provided however,
that if the Authority has received a Primary Environmental Permit for additional
production facilities and the Authority has entered into a contract for final
design and has bid construction of the facilities, the additional production
quantity specified in the Primary Environmental Permit shall be added to
the actual production capacity for purposes of determining if a "Production
Failure" has occurred.
(WW) "Project Cost" means all expenses associated with the
acquisition, construction, installation, reconstruction, renewal or replacement
of Water Supply Facilities, including without limitation: (1) land and interests
therein, property rights, and easements of any nature whatsoever; (2) physical
construction, reconstruction, renewal, replacement or completion, (3) acquisition
and installation of machinery, equipment and other tangible personal property;
(4) planning, architectural, engineering, surveying, legal, environmental
and other consultant services; (5) fees and expenses associated with the
issuance of Obligations, including but not limited to bond counsel, disclosure
counsel, financial advisor, underwriters' discount, rating agencies, bond
insurance, credit or liquidity facilities, and printing the Obligations and
supporting documentation; (6) interest accruing on the Obligations for such
period of time as the Authority deems appropriate- (7) the debt service reserve
fund or account, if any, established for the Obligations; and (8) all other
expenses that are properly attributable thereto under generally accepted
accounting principles, including reimbursement to the Authority for any moneys
advanced for such purposes and interest on any interfund loan for such purposes.
(XX) "Quality Water" means Water which meets the definition
of "Quality Water" set forth in Section 3(JJ) of the Master Water Supply
Contract. For purposes other than entitlement to the rate reductions set
forth in Section 3.04(A)(1) hereof, the term "Quality Water" also includes
Water delivered to the Points of Connection identified in Section 3.03(D)
hereof or to Points of Connection at which a Member Government agrees, at
its sole option, to accept Water not meeting the standards for Quality Water
pursuant to Section 3.03(E) hereof.
(YY) "Reclaimed Water" means, except as specifically provided
in applicable State statutes or rules, Water that has received at least secondary
treatment and basic disinfection and is reused after discharge from a domestic
wastewater treatment facility.
(ZZ) "Reclaimed Water Resource Project" means (1) the direct
use of Reclaimed Water in the Authority's Water supply, or (2) the indirect
use of Reclaimed Water in the Authority's Water supply through (a) surface
Water augmentation or (2) ground Water recharge within the Contributing Area
of any Authority wellfield.
(AAA) "Recovery Plan" means the proposed phased recovery
strategy to achieve the minimum flows and levels, to be adopted by SWFWMD
for the Northern Tampa Bay Area under Section 373.042, Florida Statutes,
pursuant to which (1) by December 31, 2002, the Authority will reduce the
combined permitted withdrawal quantity from the Partnership Plan Wellfields
to 121 mgd, on an average annual basis (to be measured from December 31,
2002 to December 31, 2003), and maintain production thereafter at or below
121 mgd, on an average annual basis; and (2) by December 31, 2007, the Authority
will reduce the combined permitted withdrawal quantity from the Partnership
Plan Wellfields to 90 mgd, on an average annual basis (to be measured from
December 31, 2007 to December 31, 2008), and maintain production thereafter
at or below 90 mgd, on an average annual basis.
(BBB) "Replacement Capacity" means production capacity from
Water Supply Facilities other than the Partnership Plan wellfields that is
(1) not available on the date hereof, and (2) will be used to reduce the
permanent combined production from the Partnership Plan Wellfields.
(CCC) "Rotational Capacity" means the production rate of
Quality Water available at any time to the Authority that (1) exceeds Member
Government needs, and (2) subject to the physical limitations of the Authority's
Water delivery system, can be used to periodically reduce the withdrawal
of Water from Authority wellfields located in environmentally stressed areas. "Rotational
Capacity" does not include Replacement Capacity.
(DDD) "Shortfall" means a situation in which the Authority
fails to deliver the quantity of Quality Water required by a Member Government.
(EEE) "Shortfall Amount" means, in the event of a Shortfall,
the amount computed by deducting the quantity of Quality Water actually delivered
by the Authority to a Member Government from the total quantity of Quality
Water required by a Member Government.
(FFF) "St. Petersburg" means the City of St. Petersburg,
a municipal corporation of the State.
(GGG) "St. Petersburg Transfer Agreement" means the agreement
attached hereto as Appendix C, pursuant to which St. Petersburg will convey
Transferred Assets to the Authority.
(HHH) "State" means the State of Florida.
(III) "SWFWMD" means the Southwest Florida Water Management
District, or any successor agency.
(JJJ) "Tampa" means the City of Tampa, a municipal corporation
of the State.
(KKK) "Tampa Transfer Agreement" means the agreement attached
hereto as Appendix E, pursuant to which Tampa will convey Transferred Assets
to the Authority.
(LLL) "Termination Funding Share" means, for each Member
Government, the percentage computed by dividing (1) the quantity of Quality
Water purchased from the Authority during the last five Fiscal Years by such
Member Government, excluding Quality Water purchased by Tampa from the Tampa
Bypass Canal, by (2) the total quantity of Quality Water purchased from the
Authority during the last five Fiscal Years by all Member Governments, excluding
Quality Water purchased by Tampa from the Tampa Bypass Canal that is not
attributable to Authority augmentation projects such as the Hillsborough
Bay Resource Exchange Project.
(MMM) "Termination Option Share" means, for each Member
Government, the percentage computed by dividing (1) the quantity of Quality
Water purchased from the Authority during the last five Fiscal Years by such
Member Government, excluding Quality Water purchased by Tampa from the Tampa
Bypass Canal, by (2) the total quantity of Quality Water purchased from the
Authority during the last five Fiscal Years by all Member Governments electing
to exercise an option to purchase a Water Supply Facility or other asset
of the Authority pursuant to Section 6.04 hereof, excluding Quality Water
purchased by Tampa from the Tampa Bypass Canal that is not attributable to
Authority augmentation projects such as the Hillsborough Bay Resource Exchange
Project.
(NNN) "Transferred Assets" means the Water Supply Facilities
(including real property, tangible personal property and intangible personal
property) conveyed to the Authority pursuant to Sections 5.01, 5.02, 5.03,
5.04, 5.05 and 5.06 hereof; provided however, that any equity interest of
the Member Governments in the Existing Authority System that is relinquished
pursuant to Sections 5.01, 5.02, 5.03, 5.04, 5.05 and 5.06 hereof shall not
constitute a "Transferred Asset."
(000) "TWRRP" means the Tampa Water Resource Recovery Project,
which includes the proposed supplemental treatment plant to be sited on Hookers
Point at Tampa's Howard F. Curren Advanced Wastewater Treatment Plant, and
the pipeline that delivers the purified water to the Tampa Bypass Canal.
(PPP) "Water" means Quality Water and any other water to
be used by a Member Government in its public water supply system.
(QQQ) "Water Supply Facilities" means Water production,
treatment and/or transmission facilities and related real property. The term "Water
Supply Facilities" does not include facilities for local distribution.
(RRR) "Wellfield Operations Plan" means a plan for operating
the Partnership Plan wellfields, which may include other Water Supply Facilities
of the Authority, that is based upon a scientific methodology to (1) evaluate
the relative level of environmental stress in the area of each of its wellfields,
(2) apply its Replacement Capacity and Rotational Capacity to reduce the
quantity of Water withdrawn from wellfields located in areas with the highest
levels of environmental stress, and (3) bring all of its wellfields into
compliance with the Recovery Plan.
(SSS) "Wheel" or "Wheeling" means the process of utilizing
any unused transmission capacity in the Authority's Water delivery system
to transport Quality Water (1) purchased from a supplier other than the Authority
pursuant to Section 3.19(A) hereof, or (2) produced from a Member Government's
Water Supply Facility acquired or constructed pursuant to Section 3.19(B)
hereof, to a Member Government's Point of Connection during a Shortfall.
SECTION 1.02. INTERPRETATION. Unless
the context indicates otherwise, words importing the singular number
include the plural number and vice versa; the terms "hereof," "hereby," "herein," "hereto," "hereunder" and
similar terms refer to this Agreement, and the term "hereafter' means
after, and the term "heretofore" means before, the effective date
of this Agreement. Words of any gender include the correlative words
of the other gender, unless the sense indicates otherwise.
SECTION 1.03. FINDINGS. It
is hereby ascertained, determined and declared by the Member Governments
that:
(A) The Water needs and environmental concerns of their citizens
can best be balanced by vesting Water supply functions in a reorganized
West Coast Regional Water Supply Authority for the purpose of developing,
recovering, storing and supplying Water for county and municipal
purposes in such a manner as will give priority to reducing adverse
environmental effects of excessive or improper withdrawals of Water
from concentrated areas.
(B) The Member Governments desire that the Authority design, acquire, construct,
operate and maintain Water Supply Facilities in the locations and at the
times necessary to insure that an adequate supply of Quality Water will be
available for all customers served by the Member Governments.
(C) The cost of the Quality Water and all services to be provided by the
Authority shall be paid for by the Member Governments, based on a uniform
rate for the sale of Quality Water (other than Water delivered to Tampa from
the Tampa Bypass Canal that is not attributable to Authority augmentation
projects such as the Hillsborough Bay Resource Exchange Project, which has
been excluded from the uniform rate provision), adjusted for special treatment
requirements in the manner set forth herein.
(D) The Member Governments shall be responsible for any additional treatment
they may individually elect, and for distribution to the Member Governments'
retail and wholesale customers.
(E) The execution and delivery of this Agreement serves the individual and
collective best interest of the Member Governments and serves a valid public
purpose by (1) preserving a means by which the Host Member Governments can
represent the interests of their constituents regarding environmental impacts
of Water withdrawals from Water Supply Facilities located within their political
jurisdictions: (2) enabling the Member Governments to reduce future costs
for litigation concerning Water supply issues- and (3) enhancing the Authority's
ability to implement its Master Water Plan by developing the Water Supply
Facilities necessary to serve the Member Governments.
SECTION 1.04. REPRESENTATIONS OF
THE MEMBER GOVERNMENTS. Upon satisfaction of the conditions
set forth in Sections 6.03(A) and (D) hereof and in reliance upon
the legislation attached hereto as Appendix M, the Member Governments
each make the following representations as it relates to itself
(no representation is made by a Member Government for any other
Member Government):
(A) The Member Governments are each duly organized,
validly existing and in good standing under the laws of the State
and are each duly qualified and authorized to satisfy their responsibilities
pursuant to this Agreement.
(B) The Member Governments each have the power, authority and legal right
to enter into and perform the obligations set forth in this Agreement, and
the execution, delivery and performance hereof by the Member Governments:
(1) has been duly authorized by the Board of County Commissioners in the
case of Hillsborough, Pasco and Pinellas, the Mayor and City Council in the
case of New Port Richey and Tampa, and the City Council in the case of St.
Petersburg; (2) does not require any consent or referendum of the electors;
and (3) does not constitute a default under, or result in the creation of
any lien, charge, encumbrance or security interest upon, the assets of the
Member Governments under any agreement or instrument to which any of the
Member Governments is a party or by which any of the Member Governments and
their assets may be bound or affected, except as otherwise provided herein.
(C) This Agreement has been duly entered into and delivered by the Board
of County Commissioners in the case of Pasco, Hillsborough and Pinellas,
by the City Council and Mayor in the case of New Port Richey, St. Petersburg
and Tampa and, upon satisfaction of the conditions set forth in Sections
6.03(A) and (D) hereof, constitutes a legal, valid and binding obligation
of the Member- Governments, fully enforceable in accordance with its terms,
except to the extent that the enforceability of this Agreement may be limited
by any applicable bankruptcy, moratorium, reorganization or other similar
laws affecting creditor's rights generally, or by the exercise of judicial
discretion in accordance with general principles of equity.
(D) There is no action, suit or proceeding, at law or in equity, before or
by any court or governmental authority, pending against any of the Member
Governments, wherein any unfavorable decision, ruling or finding would materially
and adversely affect the performance by any of the Member Governments of
their obligations hereunder or the other transactions contemplated hereby,
or which, in any way, would adversely affect the validity or enforceability
of this Agreement, the Master Water Supply Contract, the St. Petersburg Transfer
Agreement, the Pinellas Transfer Agreements, the Tampa Transfer Agreement,
the Pasco Transfer Agreement, the Hillsborough Transfer Agreement, the New
Port Richey Transfer Agreement, the Authority/Hillsborough Transfer Agreement,
the Authority/Pasco Transfer Agreement, the Authority/Tampa Transfer Agreement,
the EPC Agreement, or any other agreement or instrument entered into by the
Authority in connection with the transactions contemplated hereby.
ARTICLE II
CREATION AND GOVERNANCE
SECTION 2.01. WATER SUPPLY AUTHORITY.
(A) The Member Governments hereby reorganize the West Coast Water
Supply
Authority heretofore created pursuant to Sections 373.1962 and 163.01, Florida
Statutes, and other applicable law, for the purpose of developing, recovering,
storing and supplying Quality Water for county and municipal purposes in
such a manner as will give priority to reducing adverse environmental effects
of excessive or improper withdrawals of Water from concentrated areas. The
geographic territory of the Authority consists of Hillsborough County, Pasco
County and Pinellas County.
(B) The creation and reorganization of the Authority and the
fulfillment of its purposes are in all respects for the benefit
of the people of this State and the people of Hillsborough County,
Pasco County and Pinellas County. The Authority is performing an
essential governmental function. All property of the Authority
is and shall in all respects be considered to be public property,
and the title to such property shall be held by the Authority for
the benefit of the public. The use of such property shall be considered
a public purpose, until disposed of upon such terms as the Authority
may deem appropriate. All Obligations and interest or income thereon
and all the property, facilities, services and activities of the
Authority are declared to be nontaxable for any and all purposes
by the State or federal government or any unit of the State or
federal government to the same extent as if owned or issued by
on behalf of the Member Governments.
(C) It is the intent of the Member Governments that the creation and reorganization
of the Authority meets any applicable requirements for independent special
districts provided for in Chapter 189, Florida Statutes.
(D) All claims, causes of action, defenses, lawful debts, Obligations, contracts,
franchises, promissory notes, audits, actions, minutes, resolutions, and
other undertakings of the Authority in existence on the date of this Agreement
and upon satisfaction of the conditions described in Sections 6.03(A) and
(D) hereof are hereby validated and shall continue to be valid and binding
on the Authority in accordance with their respective terms, conditions and
covenants, unless expressly terminated, superseded or modified as specified
in this Agreement and the Master Water Supply Contract. Any proceedings heretofore
begun by the Authority for the receipt of Environmental Permits, construction
of any improvements, works or facilities- for the assessment of benefits
and damages or for the borrowing of money shall not be impaired or voided
by the reorganization of the Authority and may be continued and completed
in the name of the Authority.
SECTION 2.02. POWERS AND DUTIES
OF THE AUTHORITY.
(A) The Authority shall have the following powers in addition
to and supplementing any other privileges, benefits and powers granted
by Sections 373.1962 and 163.01, Florida Statutes:
(1) To acquire Water and Water rights; develop, store,
and transport Water- and sell Water in the manner provided herein.
(2) To sue and be sued in its own name.
(3) To acquire, by purchase, gift, devise or otherwise, and to dispose of,
real or personal property, or any estate therein.
(4) To lease, as lessor or lessee, to or from any person, firm, corporation,
association or body, public or private, facilities or property of any nature
for the use of the Authority to carry out any of the purposes authorized
by this Agreement.
(5) To make and execute contracts or other instruments necessary or convenient
to the exercise of its powers.
(6) To contract with one or more other public corporations for the purpose
of carrying out any of its powers and for that purpose to contract with such
other public corporation or corporations for the purpose of financing such
acquisitions, construction, and operations. Such contracts may provide for
contributions to be made by each party thereto, for the division and apportionment
of the expenses of such acquisitions and operations, and for the division
and apportionment of the benefits, services, and products therefrom. Such
contracts may contain such other and further covenants and agreements as
may be necessary and convenient to accomplish the purposes hereof.
(7) To contract for the service of engineers, accountants, attorneys, rate
consultants and other experts or consultants, and such other agents and employees
as the Board may require or deem appropriate.
(8) To contract with private or public entities or persons to develop, purchase
or sell Water, subject to the preferential right of each Member Government
to purchase Quality Water from the Authority for use by such Member Government-
provided however, that the Authority shall not sell Water to any customer
of a Member Government.
(9) To contract with a Member Government or any private or public entity
or person for the operation or management of Water Supply Facilities.
(10) To accomplish construction directly or by advertising for construction
bids and letting contracts for all or any part of the construction of improvements
to the Water Supply Facilities to the lowest responsible and responsive bidder
or rejecting any and all bids at its discretion; provided however, that the
competitive bid requirement may be waived if (a) the Board determines that
emergency circumstances are present or (b) after consideration of all available
alternative materials and systems, the Board determines that the specification
of a sole material or system is justifiable based upon its design, cost,
interchangeability or any other relevant factor.
(11) To exercise the power of eminent domain in the manner provided by law
for the condemnation of private property for public use, to acquire title
to such interest in real property as is necessary to the exercise of the
powers herein granted, except Water and Water rights already devoted to reasonable
and beneficial use or any water production or transmission facilities owned
by any county or municipality.
(12) To issue obligations in the manner provided in (a) Article lV hereof,
(b) the Revenue Bond Act of 1953, as amended, part 1, chapter 159, Florida
Statutes, or (c) Part 11, Chapter 159, Florida Statutes, and Section 4.09
hereof; provided however, that such Obligations shall not constitute a debt
or obligation of the Member Governments except to the extent that Member
Governments are required to comply with the terms hereof and of the Master
Water Supply Contract.
(13) To assume ownership (in fee, easement, license or other legal interest),
operation and/or control of any Water Supply Facility owned by a municipality,
county, district or authority, including the assumption of the financial
liabilities associated with such Water Supply Facilities.
(14) Subject to such provisions and restrictions as may be set forth herein
and in any instrument authorizing the issuance of Obligations, to sell or
otherwise dispose of its Water Supply Facilities, or any portion thereof,
upon such terms as the Board deems appropriate- provided however, that the
Authority shall not dispose of its Water Supply Facilities, or any portion
thereof, if the disposition would cause a Production Failure.
(15) To apply for and accept grants, loans, and subsidies from any governmental
entity for the construction, operation and maintenance of its Water Supply
Facilities, and to comply with all requirements and conditions imposed in
connection therewith.
(16) To the extent allowed by law and to the extent required to effectuate
the purposes hereof, to exercise all privileges, immunities and exemptions
accorded municipalities and counties of the State under the provisions of
the constitution and laws of the State.
(17) To appoint advisory, administrative or operation boards or committees
to assist the Authority in the exercise and performance of the powers and
duties provided for under this Agreement.
(18) To apply for, obtain and comply with Environmental Permits.
(19) To do all acts and things necessary or convenient for the conduct of
its business in order to carry out the powers and duties provided in this
Agreement.
(B) Notwithstanding the geographic territory established
in Section 2.01(A) hereof, the Authority may exercise any of its
rights, powers, privileges and authorities granted herein in any
and all portions of any county, municipality, special district or
other political subdivision of the State, heretofore or hereafter
created or organized.
(C) Notwithstanding the provisions of Section 373.1962(2)(a), Florida Statutes,
the Authority shall not impose ad valorem taxes.
(D) The Authority shall not engage in local distribution.
(E) Section 163.01(7)(g), Florida Statutes, shall not apply to the Authority.
SECTION 2.03. BOARD OF DIRECTORS.
(A) All powers, privileges and duties vested in or imposed upon
the Authority
shall be exercised and performed by and through a Board of Directors; provided
however, that the exercise of any and all executive, administrative and ministerial
powers may be delegated by the Board of Directors to the General Manager
or the General Counsel.
(B) The Board shall be comprised of nine Directors, all of whom shall be
elected officials, with each Director being entitled to one vote. The Directors
shall be appointed by the Member Governments as follows:
(1) two Directors appointed by the Hillsborough Board
of County Commissioners;
(2) two Directors appointed by the Pasco Board of County Commissioners,
(3) two Directors appointed by the Pinellas Board of County Commissioners,
(4) one Director appointed by the New Port Richey City Council;
(5) one Director appointed by the St. Petersburg City Council; and
(6) one Director appointed by the Mayor of Tampa (who may be the Mayor).
(C) Not later than ten days following the date on which the conditions
described in Section 6.03(A) have been satisfied, each Member Government
shall appoint its Director or Directors to serve in such capacity
for a period deemed appropriate by the Member Government. Re-appointments
shall be made when necessary to ensure continuous representation
of the Member Governments.
SECTION 2.04. BOARD MEETINGS. The
Board shall meet on a regular basis at such times and at such places
as determined by the Board; provided however, that special meetings
may be called by the chairman and in his or her absence by the vice
chairman. Special meetings shall be called upon receipt by the General
Manager of written requests from a majority of the Directors. To
the extent permitted by Section 286.01 1, Florida Statutes, telephonic
regular or special meetings by conference call or other method of
electronic voice transmission which permits each participant to hear
every other participant and join in the discussion are specifically
authorized.
SECTION 2.05. QUORUM AND VOTING.
(A) A quorum for the transaction of business at any regular or
special meeting of the Board shall consist of a majority of the
Directors. Notwithstanding the foregoing, a majority of the Directors
present at any meeting may act to continue the meeting to any time
and date specified in such action.
(B) Each Director shall be entitled to one vote. No vote by proxy shall be
permitted. Except as otherwise provided in Section 2.05(C) hereof, Board
action shall require an affirmative vote of not less than five Directors.
(C) The following Board actions shall require an affirmative vote of not
less than six Directors:
(1) contracts with private or public entities to purchase
or sell Water;
(2) contracts with a Member Government or any private or public entity or
person for the operation or management of the Transferred Assets and the
Water Supply Facilities owned or operated by the Authority on the date hereof;
(3) assumption of ownership, operation and/or control of any Water Supply
Facilities owned by a municipality, county, district or authority, if such
acquisition is projected to have a material adverse rate impact on the Member
Governments; and
(4) sale or other disposition of its Water Supply Facilities, or any portion
thereof.
(D) Prior to December 31, 2008, any action to acquire
or construct Water Supply Facilities for the purpose of reducing
the combined permitted withdrawal quantity from the Partnership Plan
Wellfields, on an average annual basis, to a quantity less than 90
mgd shall require an affirmative vote of all nine Directors.
SECTION 2.06. OFFICERS OF THE BOARD.
(A) The Board shall elect a chairman from their number, who shall
serve for a period of one year, or until a successor shall have
been duly elected and qualified, whichever is later. No Director
shall serve as chairman for more than two consecutive full terms.
The chairman shall preside at all meetings of the Board.
(B) The Board shall elect a vice-chairman from their number, who shall serve
for a period of one year, or until a successor shall have been duly elected
and qualified, whichever is later. No Director shall serve as vice-chairman
for more than two consecutive full terms. In case of the absence or disability
of the chairman, the chairman's duties shall be performed by the vice-chairman.
The vice-chairman shall perform such additional duties as are authorized
by the Board.
(C) If a vacancy occurs in the office of chairman or vice-chairman, the Board
shall elect a replacement to serve the balance of the unexpired term.
(D) If neither the chairman nor vice-chairman attends a meeting at which
a quorum is present, the Directors present may elect one of their number
to serve as chairman pro-tem for that meeting.
SECTION 2.07. POWERS AND DUTIES
OF THE BOARD. The Board shall act as the governing body
of the Authority and shall have the following powers and duties:
(A) To fix the time and place or places at which its regular
meeting shall be held, and to call and hold special meetings.
(B) To make and pass rules, regulations, resolutions and orders not inconsistent
with the Constitution of the United States or of the State, or to the provisions
of Sections 373.1962 and 163.01, Florida Statutes, or this Agreement, necessary
for the governance and management of the affairs of the Authority, for the
execution of the powers vested 'in the Authority, and for carrying into effect
the provisions of this Agreement.
(C) To fix the location of the principal place of business of the Authority
and the location of all offices and departments maintained thereunder.
(D) To prescribe a system of business administration and to create any and
all necessary offices in addition to chairman and vice chairman, which may
include the offices of secretary and treasurer; to establish the powers,
duties and compensation of all employees; and to require and fix the amount
of all official bonds necessary for the protection of the funds and property
of the Authority.
(E) To appoint a General Manager, who shall administer the affairs and manage
the staff of the Authority with Board approval, and perform other administrative
duties as directed by the Board.
(F) To appoint a General Counsel to act as the chief legal officer of the
Authority, manage the Authority's legal representation and employ necessary
legal staff with Board approval, provide legal advice and support to the
Board, General Manager and Authority staff, and perform such other duties
as directed by the Board.
(G) To change the Authority's name, if permitted by law.
SECTION 2.08. ANNUAL BUDGET.
(A) Prior to July 1 of each year, the General Manager shall prepare
and deliver to the Board a balanced tentative budget for the Authority
covering its proposed operating and other financial requirements
for the ensuing Fiscal Year. The tentative budget shall identify
(1) the rate at which Quality Water will be sold to Member Governments
during such Fiscal Year, and (2) the rate to be charged to Tampa
for Water provided through the Tampa Bypass Canal pumping facility
during such Fiscal Year.
(B) The Board shall publish a notice of its intention to adopt the budget
and shall provide copies of the notice and tentative budget to each Member
Government on or before the first publication date. The notice shall include
a summary of the tentative budget, specify the rates at which Quality Water
will be sold to the Member Governments and identify the time, date and place
at which the public may appear before the Board and state their objections
to or support of the budget and rates. The notice shall be published once
a week for two consecutive weeks within thirty days of the public hearing,
in any newspaper qualified to accept legal advertisements in each county
in the jurisdiction of the Authority, the last insertion of which shall appear
not less than one week prior to the date set by the Board for the hearing
on the proposed budget and rates.
(C) At the time, date and place specified in the notice, the Board shall
conduct a public hearing and thereafter may consider adoption of the budget
and rates with any amendments it deems advisable. Unless otherwise authorized
by the Board, the final budget and rates shall be adopted by August 1.
(D) The adopted budget shall be the operating and fiscal guide for the Authority
for the ensuing Fiscal Year. The Board may from time to time amend the budget
at any regular or special meeting; provided however, that prior to approving
any budget amendment that increases the total budget for any Fiscal Year
(other than a budget amendment appropriating grant funds or the proceeds
of Obligations), the Board shall provide notice and conduct an additional
public hearing in the manner described in this Section 2.08.
SECTION 2.09. MASTER WATER PLAN
(A) The Master Water Plan approved by the Authority on December
18, 1995, as updated on February 16, 1998, is hereby ratified and
confirmed as a planning document. The Authority shall periodically
review and update the Master Water Plan and pursue implementation
of identified projects in a timely manner to meet its obligation
to deliver Quality Water to the Member Governments.
(B) Within five years following the date on which the conditions described
in Sections 6.03(A) and (D) have been satisfied, and not more than every
five years thereafter, the Board shall revise the Master Water Plan. To the
extent deemed necessary or advisable by the Board, the revised Master Water
Plan shall identify current customers, projects, and future customers; review
and generally inventory all existing Authority Water Supply Facilities; identify
a capital improvement program for the Authority; review all current Authority
Environmental Permits, existing regulations and projected regulations; identify
all proposed new Water supply Facilities; evaluate Authority staffing; provide
for hydraulic analysis of the Authority's Water Supply Facilities, both existing
and proposed; evaluate present and future sources of Water and treatment
requirements for those sources in terms of capacity, reliability and economy;
and, update the list of proposed Water Supply Facilities required to meet
the anticipated Quality Water needs of the Member Governments for the next
twenty years.
SECTION 2.10. PERFORMANCE AUDIT
AND MANAGEMENT STUDY. The Authority shall conduct a performance
audit and management study immediately following the end of the
first full Fiscal Year after satisfaction of the conditions described
in Sections 6.03(A) and (D) hereof, and at five-year intervals
thereafter, to review program results and make recommendations
regarding its governance structure and the proper, efficient, and
economical operation and maintenance of the Authority's Water Supply
Facilities. The Authority shall retain a nationally recognized
accounting firm or management consulting firm to conduct the performance
audit and management study.
ARTICLE III
WATER SUPPLY PROVISIONS
SECTION 3.01. REGIONAL
COOPERATION. The Member Governments agree that cooperative
efforts are necessary in order to meet their respective needs for
Quality Water in a manner which will provide adequate and dependable
supplies in such a manner as will give priority to reducing adverse
environmental effects of excessive or improper withdrawals of water
from concentrated areas. The Member Governments shall continue
their cooperative efforts to develop and implement effective conservation
programs in order to reduce per capita demand for Water.
SECTION 3.02. EXCLUSIVITY. Except
as provided in Section 3.02(I) hereof, it is expressly understood
and agreed that the Authority shall be the sole and exclusive supplier
of Water to the Member Governments and that the Member Governments
shall not own or operate Water Supply Facilities.
(A) If any Member Government acquires a private utility
company, the Authority shall be entitled to acquire any Water Supply
Facilities owned by the private utility. If the authority elects
to exercise its option, the Water Supply Facilities shall be appraised
by two independent appraisers acceptable to the Authority and the
Member Government in their reasonable judgment. The Authority will
purchase the Water Supply Facilities upon payment of an amount equal
to the average of the two appraised values and, if applicable, any
debt, fines, or other obligations assumed by the Member Government
and any cost expended by the Member Government to bring the Water
Supply Facilities into regulatory compliance.
(B) The Member Governments shall neither create nor, to the extent permitted
by law, allow creation of any special district or other governmental authority
located wholly or partially within the geographic territory of the Authority
pursuant to Chapter 189, Florida Statutes, Section 163.01, Florida Statutes,
Section 373.1962, Florida Statutes, or any other provision of general or special
law or by ordinance or contract, if the special district or other governmental
authority is authorized to produce Water for use within the geographic territory
of the Authority. This Section 3.02(B) shall not apply to the creation of any
special district or other governmental authority that is required to use the
Authority (through a Member Government) as its exclusive supplier of Water
to be delivered to customers located within the geographic territory of the
Authority to the same extent as required by the Member Governments (other than
Tampa) hereunder.
(C) The Member Governments shall not privatize all or any portion of their
Water utility systems without including in the contract with the private entity
a provision which obligates the private entity to use the Authority as its
exclusive supplier of Water to be delivered to customers located within the
geographic territory of the Authority to the same extent as required by the
Member Governments (other than Tampa) hereunder.
(D) The Member Governments shall not sell, lease or otherwise dispose of all
or any portion of their Water utility systems' distribution facilities without
requiring the purchaser or lessee to use the Authority (through a Member Government)
as its exclusive supplier of Water to be delivered to customers located within
t6he geographic territory of the Authority to the same extent as required by
the Member Governments (other than Tampa) hereunder. To the extent permitted
by law, the obligation to use the Authority (through a Member Government) as
the exclusive supplier of Water to be delivered to customers located within
the geographic territory of the Authority shall be imposed as a restrictive
covenant against any real property conveyed in connection with the disposition
of such distribution facilities.
(E) To the extent permitted by law, the Member Governments shall not franchise
new or expanded private water utilities following the date hereof unless the
franchisee agrees to use the Authority (through the Member Government) as its
exclusive supplier of Water to be delivered to customers located within the
new or expanded franchise area and the geographic territory of the Authority
to the same extent as required by the Member Governments (other than Tampa)
hereunder.
(1) Notwithstanding the foregoing, Member Governments
may franchise new or expanded private water utilities without
the requirement to use the Authority (through the member Government)
as its exclusive supplier of Water to be delivered to customers
located within the geographic territory of the Authority if (a)
the Member Government has provided a copy of the franchise application
to the Authority, and (b) within forty-five days of its receipt
of such notice, the Authority does not notify the Member Government
that it intends to supply Quality Water to the franchise area
to serve customers located with the geographic territory of the
Authority.
(2) If the Authority elects to supply Quality Water to the new or expanded
franchise area, the franchises will be responsible for constructing the Water
Supply Facilities required to produce Quality Water to serve customers located
within the new or expanded franchise area and the geographic territory of
the Authority and will be required to dedicate such Water Supply Facilities
to the Authority without cost to the Authority. Following dedication, the
Authority will be responsible for operating and maintaining the Water Supply
Facilities at its own expense. Quality Water shall be provided to the franchise
area only through the Member Government. Nothing in this Section 3.02(E)
shall be construed to require either Hillsborough or the Authority to extend
any transmission facilities to serve the proposed franchise area.
(F) The Member Governments shall not assist or encourage the
creation or expansion of a private utility by the Florida Public
Service Commission unless the private utility agrees to use the
Authority (through a Member Government) as its exclusive supplier
of Water to be delivered to customers located within the geographic
territory of the Authority to the same extent as required by
the Member Governments (other than Tampa) hereunder.
(G) The Member Governments shall not merge or consolidate their
water utility systems with water utility systems owned and/or
operated by other Member Governments, other local governments,
units of federal or State government, special districts, governmental
authorities, persons, corporations or other entities without
requiring all other parties to use the Authority (through the
Member Government) as their exclusive supplier of water to be
delivered to customers located within the geographic territory
of the Authority to the same extent as required by the Member
Governments (other than Tampa) hereunder.
(H) The Member Governments shall not work in concert with any person, corporation,
local government, unit of federal or State government, special district,
governmental authority or other entity for the purpose of avoiding or evading
the exclusivity requirements of this Section 3.02.
(I) The exclusivity requirements set forth in this Section 3.02 are subject
only to the following exceptions:
(1) The Member Governments shall have the right to construct,
operate and maintain the specific Water Supply Facilities authorized
by Sections 3.06 through 3.10, inclusive.
(2) The Member Governments shall have the right to acquire Water, construct
Water Supply Facilities and Wheel Quality Water upon the occurrence of a
Production Failure, as set forth in Section 3.19 hereof.
(3) Hillsborough may continue its practice of purchasing water from Plant
City at the current quantity of approximately 0.2 mgd, plus any increases
necessary to adequately supply the Oaks Utility service area.
(4) Pasco may continue its practice of purchasing Water from Dade City at
the current quantity of approximately 0.009 mgd, plus any increases necessary
to adequately supply the Eldred Subdivision.
(5) Pasco may continue its practice of purchasing water from Zephyrhills
at the current quantity of approximately 0.020 mgd, plus any increases necessary
to adequately supply the Florida Trailer Estates.
(6) Member Governments may acquire Water Supply Facilities when required
by law, but shall convey such Water Supply Facilities to the Authority at
the earliest practical date, upon payment by the Authority of an amount equal
to the Member Government's Actual Direct Cost, retaining ownership of any
treatment and distribution facilities.
(7) Nothing in this Agreement shall be construed to prohibit the Member Governments
from temporarily exchanging or purchasing Water, either among themselves
or with other public or private utilities, for emergency and maintenance
purposes in the ordinary course of business.
(8) The Member Governments may continue to own and operate the wells listed
in Appendix A. Except as otherwise provided herein, the Member Governments
shall not withdraw Water from any wells not listed in Appendix A. The Authority
is hereby granted an option to purchase (a) any Water Supply Facility owned
by a Member Government on the date of this Agreement that is not listed in
Appendix A, and (b) any Water Supply Facility listed in Appendix A is increased
by more than twenty percent. If the Authority elects to exercise its option,
the purchase price shall be equal to the Member Government's Actual Direct
Cost to acquire and construct the Water Supply Facility.
SECTION 3.03. OBLIGATION TO MEET
WATER NEEDS
(A) Except as otherwise expressly provided herein or in
the Master Water Supply Contract, the Authority shall have the absolute
and unequivocal obligation to meet the Quality Water needs of the
Member Governments. Quality Water needs of the Member Governments
shall be satisfied before Quality Water is delivered to any other
customer of the Authority.
(B) The Authority shall oppose any permit, order, rule or other regulatory
effort to reduce or limit the permitted capacity of its Water Supply Facilities,
unless (1) the reduction or limitation results from an agreement to which all
Member Governments are parties, or (2) the reduction or limitation will not
become effective until adequate Replacement Capacity has been placed in service.
(C) The General Manager shall actively monitor the relationship between the
quantity of Quality Water actually delivered by the Authority to the Member
Governments and the aggregate permitted capacity of the Authority's production
facilities.
(1) If the actual delivery of Quality Water by the
Authority to the Member Governments during any twelve-month period
exceeds 75 percent of the aggregate permitted capacity of the
Authority's projection facilities, the General Manager shall
report to the Bard and recommend that the Authority initiate
preparation of Primary Environmental Permit applications necessary
to ensure an adequate supply. The authority shall initiate any
such applications expeditiously.
(2) If the actual delivery of Quality Water by the Authority to the Member
Governments during any twelve-month period exceeds 85 percent of the aggregate
permitted capacity of the Authority's production facilities, the General
Manager shall report to the Board and recommend that the Authority file Primary
Environmental Permit applications to ensure an adequate supply. The Authority
shall file any such applications expeditiously.
(D) It is acknowledged and agreed that the Water delivered by the
Authority (1) from the South Central Hillsborough Wellfield to
the Lithia Water Treatment Plant, (2) from the Starkey and North
Pasco Wellfields to the Maytum Water Treatment Plants, (3) from
the Starkey and North Pasco Wellfields to the little Road Water
Treatment Plant, (4) from the Eldridge-Wilde Wellfield to the Keller
Water Treatment Plant, (5) from the Cosme-Odessa Wellfield to the
Cosme Water Treatment Plant, and (7) from the Tampa Bypass Canal
to the Hillsborough River Reservoir, will not meet the standards
for Quality Water at the Point of Connection due to excessive concentrations
of hydrogen sulfide currently being removed by Member Governments
at their own treatment facilities. In order to continue meeting
Quality Water standards and maintain price equity upon implementation
of the uniform rate pursuant to Section 3.04 hereof, the Member
Governments receiving such Water (other than Water delivered to
Tampa from the Bypass Canal that is not attributable to Authority
augmentation projects such as the Hillsborough Bay Resource Exchange
Project, which has been excluded from Section 3.04 pursuant to
Section 3.08(D) hereof) will be entitled to a credit against the
uniform rate, as set forth in Section 3.04(A)(1) hereof.
(E) Member Governments may agree, at their sole option, to accept Water not
meeting the standards for Quality Water at any other Point of Connection. In
such event, the Member Government shall also be entitled to a credit against
the uniform rate, as set forth in Section 3.04(A)(1) hereof.
SECTION 3.04. UNIFORM RATE
(A) The Authority shall establish a single uniform rate
for the sale of Quality Water to member Governments, subject only
to the adjustments set forth in this Section 3.04(4A) shall not apply
to Quality Water delivered to Tampa from the Tampa Bypass Canal that
is not attributable to Authority augmentation projects such as the
Hillsborough Bay Resource Exchange Project, for which the rate is
established in Section 3.08(D) hereof.
(1) If the Authority delivers Water that does not meet
the standards for Quality Water either (a) to the Points of Connection
at the facilities described in Section 3.06(D) hereof, or (b) at
other Points of Connection with the express acknowledgment and
consent of the receiving Member Government, the rate charged for
such Water shall be reduced to reflect the Member Government's
Actual Direct cost to perform the additional treatment required
to meet the standards for Quality Water. Any facilities and processes
required to perform the additional treatment shall be consistent
with generally accepted engineering guidelines.
(2) If a member Government requests the Authority to provide any other treatment
beyond that necessary to meet Quality Water standards and the Authority agrees
to provide such additional treatment, in its sole discretion, the rate charged
to such Member Government shall be increased to reflect the Authority's Actual
Direct Cost to provide such additional treatment.
(3) Credits received by a Member Government in consideration of its conveyance
of Transferred Assets will be applied to reduce the cost of purchasing Quality
Water in equal monthly installments over a thirty-year period, assuming that
such credits bear interest, compounded semiannually, at the rate borne by
any Obligations issued by the Authority to finance a cash acquisition of
Transferred Assets, credits shall accrue interest, compounded semiannually,
at the rate borne by Obligations issued by the Authority to refinance its
outstanding Capital Improvement Revenue Bonds, Series 1979, Refunding Revenue
Bonds Series 1985, Refunding Revenue Bonds, Series 1989A, Capital Improvement
Revenue Bonds, Series 1989B, Refunding Revenue Bonds, Series 1992, Refunding
Revenue Bonds, Series ;1995, Revenue Note, Series 1997, Cypress Creek Capital
Lease Obligation, Starkey Wellfield Capital Lease Obligation, and Series
1991 Revenue Notes.
(B) The rate for the sale of Quality Water to Member Governments
shall be established for each Fiscal Year in the Authority's annual
budget. Except as provided in Section 3.04(C) hereof, the rate shall
not be increased during the Fiscal Year.
(C) If the Authority is required to increase the rate by the terms of the Financing
Documents, notice shall be provided by registered mail to each Member Government.
The notice shall include the proposed new rate and identify the time, date
and place at which the Board intends to approve the increase. Any increase
to the rate shall take effect on the date specified by the Board, which shall
not be earlier than the sixtieth day following its adoption.
SECTION 3.05. MASTER WATER SUPPLY CONTRACT. Simultaneously
with the execution of this Agreement, the Authority and each Member
Government shall enter into the Master Water Supply Contract, in the
form attached hereto as Appendix B SECTION 3.06. ISOLATED WATER SUPPLY
FACILITIES.
(A) If a new development within the jurisdiction of a
Member Government cannot be served on an economically feasible basis
with Quality Water supplied by the Authority because of the distance
between the development and the Member Government's closest transmission
facility, the Member Government may acquire or construct a Water
Supply Facility consisting of one or more withdrawal points with
a total capacity sufficient to serve the development, but in no event
more than 1 mgd (on an annual average basis) for such purpose, upon
compliance with the requirements set forth in this Section 3.06.
(1) The Member Government shall provide information
demonstrating that the area in question cannot be served with Quality
Water supplied by the Authority on an economically feasible basis.
Within sixty days of its receipt of the information, the Authority
may elect to acquire or construct Water Supply Facilities in a
location that will provide service on an economically feasible
basis.
(2) If no election is made within the sixty day period, the Member Government
may proceed with acquisition or construction and shall own and operate the
Water Supply Facility, subject to the Authority's option at any time to acquire
such Water Supply Facility from the Member Government. If the Authority elects
to exercise its option, the purchase price shall be equal to the Member Government's
Actual Direct Cost to acquire and construct the Water Supply Facility.
(B)The parties acknowledge that Pasco applied to SWFFWMD
in April 1996 for a Primary Environmental Permit (applications 20025.06
and 2011480, as modified) to withdraw Water at an average annual
rate of one mgd from a new Water Supply Facility consisting of 4
new wells and specified existing wells located near the Cypress Creek
and Cypress Bridge Wellfields. Within thirty days of the date on
which the conditions described in Sections 6.03(A) and (D) hereof
have been satisfied, Pasco may modify its permit application to eliminate
the new Water Supply Facility. If the permit application is not modified,
as described above, within the thirty-day period, the Authority shall
have a sixty-day period to either determine that the proposed Water
Supply Facilities are not required to meet the Member Governments'
needs, or elect to assume responsibility for construction, ownership
and operation of the Water Supply Facility. If no determination or
election is made within the sixty-day period, Pasco may proceed with
construction and shall own and operate the Water Supply Facility,
subject to the Authority's purchase option described in Section 3.06(B)(3)
hereof.
(1) If the Authority determines that the proposed Water
Supply Facilities are not required to meet the Member Governments'
needs, Pasco agrees to withdraw its Primary Environmental Permit
application or modify its Primary Environmental permit, if issued,
to eliminate the four new wells.
(2) If the Authority elects to construct, own and operate the Water Supply
Facility, any plans, permits and specifications for construction, and the
land upon which the Water Supply Facility is to be located, will be transferred
to the Authority as follows:
(a) Pasco will transfer its rights to any plans and
specifications to the Authority upon reimbursement by the Authority
of Pasco's Actual Direct Cost thereof. From time to time and
upon receipt of a written request from the Authority, Pasco may
assign in writing to the Authority all rights which Pasco may
then possess against (A) any parties who prepared the plans and
specifications for the Water Supply Facility and (B) all contractors,
subcontractors and material suppliers for the Water Supply Facility,
reserving to Pasco the right to subsequently prosecute any claims
against said parties that may arise as a result of any claims,
action, loss or damage sustained by Pasco arising out of any
of the plans and specifications for the Water Supply Facility
or construction of the Water Supply Facility.
(b) Pasco and the Authority will make joint application for transfer of
any Environmental Permits.
(c) The land upon which the Water Supply Facility is located shall be appraised
by two independent appraisers acceptable to the Authority and Pasco in
their reasonable judgment , and the Authority will purchase the property
upon payment of an amount equal to the average of the two appraised values.
(3) If the Authority fails to determine that the proposed
Water Supply Facilities are not required to meet the Member Governments'
needs and does not elect to construct, own and operate the Water
Supply Facility, the Authority shall have the option at any time
to acquire such Water Supply Facility from Pasco. If the Authority
elects to exercise its option, the purchase price shall be equal
to Pasco's Actual Direct Cost to acquire and construct such Water
supply Facility.
SECTION 3.07. WALSINGHAM FACILITY. The
Member Governments acknowledge and agree that Pinellas shall be permitted
to contract with Permasep, L.L.C. to acquire the Water produced at
Permasep, L.L.C.'s proposed Walsingham reverse osmosis Water treatment
plant, which will have a proposed average annual production capacity
up to 10 mgd. It is understood and agreed that the location of the
project may be subject to change; provided however, that any new
location shall be wholly within the boundaries of Pinellas.
(A) Pinellas hereby grants an option to the Authority
for purchase of all Water available to Pinellas from the Walsingham
facility. Pinellas shall provide notice to the Authority not less
than ninety days prior to the date on which the Walsingham facility
will be placed in service. The notice will include (1) the date on
which the Walsingham facility will begin to produce Water, (2) all
available information regarding the quality of Water to be produced,
and (3) the cost (or method of determining the cost) at which Pinellas
has agreed to purchase the Water. On or prior to the initial production
date specified in the notice, the Authority may exercise its option
to purchase the Water. This option shall expire in not exercised
by the Authority within sixty days of the notice.
(B) Upon timely exercise of the option, the Authority shall purchase Water
produced at the Walsingham facility from Pinellas at the same price at which
Pinellas purchases the Water from Pernasep, L.L.C. if permitted under the terms
of Pinellas' agreement with Permasep, L.L.C. and upon agreement among Pinellas,
Permasep, L.L.C. and the Authority, the right to purchase Water directly from
the Walsingham facility may be assigned by Pinellas to the Authority.
It is understood and agreed that any Water purchased by the Authority from
the Walsingham facility will be delivered directly to Pinellas under the Master
Water Supply Contract and that the rate payable by Pinellas to the Authority
pursuant to Section 3.04 hereof may be more or less than the rate at which
the Authority purchases the Water from Pinellas or Permasep, L.L.C.
(C) It is understood and agreed that any Water purchased by the Authority from
the Walsingham facility will be delivered directly to Pinellas under the Master
Water Supply Contract and that the rate payable by Pinellas to the Authority
pursuant to Section 3.04 hereof may be more or less than the rate at which
the Authority purchases the Water from Pinellas or Permasep, L.L.C.
SECTION 3.08. SURFACE WATER SOURCES
(A) The parties acknowledge that Tampa's historical use
of surface Water sources constitutes a special circumstance justifying
an exception to the exclusivity requirements of Section 3.02 hereof.
In recognition of this special circumstance, the parties agree to
(1) reserve Tampa's existing permitted capacity for
withdrawals from the Hillsborough River (82 mgd average annual
day, 92 mgd peak month and 104 mgd maximum day). Withdrawals from
Sulphur Springs (5 mgd average annual day, 10 mgd peak month and
20 mgd maximum day) and the Tampa Bypass Canal (20 mgd average
annual day and 40 mgd maximum day) have also been permitted as
augmentation quantities for the Hillsborough River in order to
facilitate Tampa's withdrawals from the Hillsborough River at the
permitted 82 mgd average annual day, 92 mgd peak month and 104
mgd maximum day rates;
(2) protect Tampa's priority access to the Tampa Bypass Canal as described
in Section 3.08(D) hereof; and
(3) permit the Authority, on behalf of the region, to access Hillsborough
River and Tampa Bypass Canal surface Water sources during High Flow Periods,
as described in Section 3.08(D) hereof; provided however, that
(4) after the Authority has satisfied its need for Water from the Hillsborough
River during High Flow Periods, Tampa may increase its rates of withdrawal
up to 142 mgd peak month and 142 mgd maximum day, pursuant to 3.08(C) hereof,
when such quantities are available and permitted for Tampa's use.
It is understood and agreed that Tampa's exception to the exclusivity requirements
of Section 3.02 hereof is limited to the quantities described in Sections
3.08(A)(1) and 3.08(A)(4) and the use of Reclaimed Water, as set forth in
Section 3.09 hereof.
(B) Tampa shall continue meeting a portion of its Water
needs from surface Water sources, in the manner provided herein.
Notwithstanding any other provisions of this Agreement to the contrary,
the Authority's obligation to meet Tampa's Water needs shall be reduced
by the amount of Water that can be derived from Tampa's use of such
surface water sources. It is understood and agreed that the Authority's
current Water Supply Facilities and Master Water Plan do not contemplate
the need to permanently replace the quantity of Water that Tampa
is currently permitted to withdraw from surface Water sources, as
set forth in Section 3.08(A)(1) hereof. However, upon the occurrence
of an environmental or physical catastrophe that impairs Tampa's
use of the Hillsborough River Reservoir, the Tampa Bypass Canal or
Sulphur Springs (it being understood that an environmental or physical
catastrophe excludes regulatory actions unrelated to specific events),
Tampa shall request and the Authority shall assist Tampa with its
unanticipated need for additional Quality Water as follows:
(1) the Authority agrees to seek an emergency increase
in all interconnected regional system permits during such an emergency
period;
(2) subject only to the physical limitations of the Authority's conveyance
system and Tampa's receiving facilities, all Quality Water not required to
meet the other Member Governments' needs will be delivered to Tampa; and
(3) the Authority will use its best efforts to increase its supply of Quality
Water to meet Tampa's Quality Water needs.
It is understood and agreed that the foregoing measures may not compensate
for the entire shortfall.
(C)Tampa will continue to hold its existing permit to
withdraw Water from the Hillsborough River and Sulphur Springs at
the quantities set forth in Section 3.08(A)(1) hereof. After the
Authority has received a Primary Environmental Permit or Primary
Environmental Permits to access Hillsborough River and Tampa Bypass
Canal surface Water sources during High Flow Periods for regional
purposes, Tampa may seek an increase in its rates of withdrawal up
to 142 mgd peak month and 142 mgd maximum day; provided however,
that the proposed increase by Tampa shall not reduce the quantities
available to the Authority for the region under the aforementioned
regional Primary Environmental Permit or Primary Environmental Permits.
If for any reason the Authority is not granted the aforementioned
permit or permits by December 31, 2010, Tampa may apply for an increase
in its rates of withdrawal from the Hillsborough River Reservoir.
Additionally, after the Authority's permitted withdrawals for regional
use have been met, Tampa may seek an increase in the annual average
withdrawal from the Hillsborough River Reservoir to satisfy environmental
regulatory needs. The Authority agrees to support renewal for at
least a 20-year period, pursuant to existing statutory guidelines,
of Tampa's existing permit for the withdrawal of such quantities
and the other Member Governments agree not to oppose the renewal
of said permit. Tampa has the right to manage and use the Hillsborough
River and the Tampa Bypass Canal as an integrated system as its primary
sources of supply in preference to the Quality Water supplied by
the Authority. Management of the Hillsborough River Reservoir and
the Tampa Bypass Canal will be consistent with the current operations
as identified in subsections (1), (2) and (3) of Section 3.08(D)
hereof or as otherwise modified in the comprehensive management plans
provided for in Section 3.08(AG) hereof.
(D)The Authority will maintain ownership of the Tampa Bypass Canal pumping
facility and will be sole permittee on Primary Environmental Permits for the
Tampa Bypass Canal. Tampa agrees to support the Authority's application to
become sole permittee provided the City's current operating procedures are
not modified or restricted. Tampa is granted priority for delivery of Water
from the Tampa Bypass Canal to augment the Hillsborough River Reservoir up
to 20 mgd on an average annual basis and up to 40 mgd on a maximum daily basis,
as set forth in subsections (1) and (2) of this Section 3.08(D). It is mutually
understood that the Tampa Bypass Canal may be incapable of sustaining withdrawal
rates up to 40 mgd under certain naturally occurring hydrologic conditions.
As such the 40 mgd maximum day quantity represents a quantity that will be
delivered for augmentation of the Hillsborough Reservoir only as available
from the middle pool of the Tampa Bypass Canal. Notwithstanding the provisions
of Section 3.04 hereof, the rate charged to Tampa for Water provided through
the Tampa Bypass Canal pumping facility will be equal to the Authority's direct
cost and Allocated Overhead. In the event that Authority withdrawals have precluded
Tampa from obtaining its needed share from the Tampa Bypass Canal, (up to 20
mgd annual average daily and a40 mgd maximum day) the Authority shall supply
Water to Tampa to compensate for any shortfall at the same rate Tampa would
have paid for Water delivered from the Tampa Bypass Canal to the Hillsborough
River Reservoir.
(1) The Authority's Harney Pumping Station on the Tampa
Bypass Canal shall augment the Hillsborough River Reservoir within
the permitted quantity range specified in Section 3.08(C) hereof
when the draft from Tampa's Hillsborough River Treatment Plant
exceeds the flow in the Hillsborough River as measured at the Morris
Bridge Hillsborough River flow gauge and the Hillsborough River
Reservoir stage is below 22.5 feet MSL as measured at the Hillsborough
River Reservoir dam.
(2) The Authority may pump the lower pool of the Tampa Bypass Canal at any
time. Authority withdrawals from the middle pool of the Tampa Bypass Canal
for regional use shall not be made when augmentation of the Hillsborough
Reservoir from the Tampa Bypass Canal is ongoing. In addition, Authority
withdrawals from the middle pool for regional use shall be in conformance
with the comprehensive management plan provided for in Section 3.08(G) hereof,
which may include the Tampa Water Resource Recovery Project.
(3) The Authority may divert withdrawals from the Hillsborough River to either
or both of the Tampa Bypass Canal or the Hillsborough River Water Treatment
Facility for use by the region during High Flow Periods.
(E) The Authority shall not apply for Primary Environmental
Permits to withdraw Water from the Hillsborough River that are in
conflict with Tampa's use of the Hillsborough River as set forth
in Section 3.08(A) hereof. Tampa may exercise Host Member Government
rights pursuant to Section 3.13 hereof to contest any such Primary
Environmental Permit application. The Authority may apply for either
a modification of the existing Primary Environmental permit or an
additional Primary Environmental Permit to allow its withdrawal of
Water from the Tampa Bypass Canal to serve all of the Member Governments;
provided, however, that any such application shall not modify or
restrict Tampa's priority for delivery of Water from the Tampa Bypass
Canal, as described in Section 3.08(D) hereof. Tampa may exercise
Host Member Government rights pursuant to Section 3.13 hereof to
contest any such permit application.
(F) The Morris Bridge Wellfield will be conveyed to the Authority as required
by Section 5.03 hereof. Tampa agrees to support transfer of the existing Primary
Environmental Permit to the Authority at the current permitted quantities of
withdrawal (15.5 mgd average day, 27 mgd peak month and 30 mgd maximum day);
provided however, that Tampa Bay may exercise Host Member Government rights
pursuant to Section 3.13 hereof to contest any subsequent application for a
Primary Environmental Permit renewal or modification for the Morris Bridge
Wellfield.
(G) The Authority and Tampa will work in cooperation with SWFMD to develop
a unanimously agreed upon comprehensive management plan for the Hillsborough
River, the Tampa Bypass Canal, Sulphur Springs and the Morris Bridge Wellfield.
(H) Tampa shall have the right to continue its ongoing studies and implementation
of Aquifer Storage and Recovery programs at such time as the Authority can
provide additional surface water to the region and Tampa.
(I) Tampa and the Authority agree to amend the Agreement for New Water Source
Funding between the West Coast Regional Water Supply Authority and the City
of Tampa for the TWRRP. The authority shall pay Tampa's local share of the
TWRRP. Tampa will administer the federal funding for the TWRRP as well as its
design, construction and operations. If this project is selected by the Authority,
the Authority and Tampa shall enter into an operations agreement whereby Tampa
is paid for operating the project. The Authority will administer SWFWMD funding
for the Hillsborough Bay Resource Exchange Project. The SWFWMD funding will
be apportioned between three main elements of the project proportionate to
their design and construction costs. The Authority will administer the design,
construction and operations of the surface water treatment plant.
SECTION 3.09. RECLAIMED WATER. Except
as provided in Section 3.08(I), the Member Governments shall retain
the exclusive right to develop, own, and/or operate all facilities
for Reclaimed Water. However, in connection with the TWRRP, (A) all
applicable permits required for the construction of the TWRRP must
be issued to the Authority on or before December 31, 2009, and (B)
the Authority must commence operation of the TWRRP on or before December
31, 2012. If the Authority fails to meet either one of the foregoing
conditions, then all provisions of this Agreement pertaining to the
TWRRP shall be deemed null and void and of no further force and effect.
In such event, the Authority shall have no right, title or interest
of any kind whatsoever in any of the tertiary treated wastewater produced
by Tampa's Howard F. Curren Wastewater Treatment Plant and Tampa will
retain the rights to develop, own and/or operate facilities for Reclaimed
Water.
SECTION 3.10. CLEARWATER FACILITIES. Pinellas
may construct Water Supply Facilities using reverse osmosis or other technology
to replace facilities currently operated by the City of Clearwater upon compliance
with all of the following requirements:
(A) the plans, specifications and permits for construction
of the Water Supply Facility and an estimated operating cost projection
shall be provided to the Authority. Within ninety days of its receipt
thereof, the Authority may elect to assume responsibility for construction,
ownership and operation of the Water Supply Facility. If no election
is made within the ninety day period, Pinellas may proceed with construction
and shall own and operate the Water Supply Facility, subject to the
Authority's purchase option described in Section 3.10(C) hereof.
(B) If the Authority elects to construct, own and operate the Water Supply
Facility, the plans, permits and specifications for construction and the land
upon which the Water Supply Facility is to be located, will be transferred
to the Authority as follows:
(1) Pinellas will transfer its rights to the plans and
specifications to the Authority upon reimbursement by the Authority
of Pinellas' Actual Direct Cost thereof. Form time to time and
upon receipt of a written request from the Authority, Pinellas
shall assign in writing to the Authority all rights which Pinellas
may then possess against (A) any parties who prepared the plans
and specifications for the Water Supply Facility and (B) all contractors,
subcontractors and material suppliers for the Water Supply Facility,
reserving to Pinellas the right to subsequently prosecute any claims
against said parties that may arise as a result of any claims,
action, loss or damage sustained by Pinellas arising out of any
of the plans and specifications for the Water Supply Facility or
construction of the Water Supply Facility.
(2) The Authority and Pinellas will make joint application for transfer of
the Environmental Permits.
(3) The land upon which the Water Supply Facility is to be located shall
be appraised by two independent appraisers acceptable to the Authority and
Pinellas in their reasonable judgment, and the Authority will purchase the
property upon payment of an amount equal to the average of the two appraised
values.
(C) If the Authority declines to construct, own and operate
the Water Supply Facility, the Authority shall have the option at
any time to acquire such Water Supply Facility from Pinellas. If
the Authority elects to exercise its own option, the purchase price
shall be equal to Pinellas' Actual Direct Cost to acquire and construct
such Water Supply Facility.
SECTION 3.11. SERVICE DISRUPTIONS. The
Authority shall provide notice to the Member Governments not less than
five days prior to closing any Water Supply Facility for scheduled
maintenance or repair. Furthermore, the Authority shall provide, as
necessary, alternative means for providing Quality Water supply services.
Upon the occurrence of any unforeseen mechanical, equipment or other
failure of a Water Supply Facility, the Authority shall provide notice
to the Member Governments that is reasonable under the circumstances.
Any service disruption that results from mechanical equipment or other
failure shall be remedied as quickly as technically feasible.
SECTION 3.12. PERMITS AND LICENSES.
(A) The Authority shall make timely application for all
primary Environmental Permits required to meet the Quality Water
needs of the Member Governments in such a manner as will give priority
to reducing adverse environmental effects of excessive or improper
withdrawals of water from concentrated areas. The Authority shall
provide the Member Governments with three day's notice of all preapplication
meetings with the permitting agencies for Primary Environmental Permits
and shall also provide the Member Governments, upon request, with
copies of all applications, including modification or renewal applications,
supplemental or clarifying information requested by the permitting
agency, and the technical data and basis for such applications and
filings. All applications and amendments to Primary Environmental
Permit applications shall be approved by the Board before filing
with the permitting agency and shall include proposed permit conditions.
(B) It is hereby stipulated and agreed that only a Host Member Government,
in its individual capacity, has a substantial interest in any application made
by the Authority for a Primary Environmental Permit. All disputes between a
Host Member Government and the Authority related to a Primary Environmental
Permit shall be resolved pursuant to Sections 3.13 hereof. All other Member
Governments hereby waive their individual right to participate directly in
disputes related to any application made by the Authority for a Primary Environmental
Permit, and agree to participate solely through actions taken by the Authority.
(C) The Authority shall operate its Water Supply Facilities in compliance with
the terms and conditions of all Primary Environmental Permits. If a Member
Government asserts that the Authority is not in compliance with the terms and
conditions of a Primary Environmental Permit, the Member Government shall initiate
the dispute resolution procedure set forth in Section 6.06 hereof. If the issue
remains unresolved following completion of the dispute resolution procedure,
the Member Government may initiate a circuit court action against regulatory
agencies and/or the Authority pursuant to Section 403.412(2), Florida Statutes.
Except as provided in this Section 3.12(C), all Member Governments, including
Host Member Governments, hereby waive their individual right to participate
directly in any enforcement action related to Primary Environmental Permits
and agree to participate solely through actions taken by the Authority- provided
however, that a Member Government shall have the right to defend itself in
any enforcement action brought against the Member Government by a regulatory
agency, the Authority, another Member Government or any other party.
(D) Notwithstanding this Section 3.12 or any other provision of this Agreement
to the contrary, the Member Governments shall continue to have full standing
with regard to Division of Administrative Hearings Case Nos. 95-1520 through
95-1528, including but not limited to the current permit renewal administrative
proceedings and any subsequent appeal thereof, whether judicial, administrative
or quasi-judicial in nature.
(E) The parties acknowledge that on the date the conditions described in Section
6.03(A) hereof are satisfied, one or more Member Governments may be contesting
or opposing Primary Environmental Permits sought by the Authority. Except as
provided in Section 3.12(D) hereof, the provisions of this Section 3.12(E)
shall control the resolution of all issues related to such contests.
(1) Within thirty days of the date on which the Authority
provides written notice to all Member Governments that the conditions
set forth in Section 6.03(A) hereof have been satisfied, any Member
Government qualifying as a Host Member Government in connection
with a Primary Environmental Permit may initiate the dispute resolution
procedure set forth in Section 3.13 hereof. Host Member Governments
initiating the dispute resolution procedure may continue to contest
the Primary Environmental Permit until the arbitrators' decision
has been issued. In addition, if the contested Primary Environmental
Permit relates to a Transferred Asset, the Member Government required
to convey the Transferred Asset may continue to contest the Primary
Environmental Permit until (a) the arbitrators' decision has been
issued or (b) the conditions described in Section 6.03(D) hereof
have been satisfied, whichever shall occur first. All other Member
Governments shall dismiss or otherwise withdraw from such proceedings.
(2) Upon satisfaction of the conditions described in Section 6.03(D) hereof,
the Authority shall be substituted in such proceedings for the Member Government
that has conveyed the Transferred Asset- provided however, that to the extent,
if any, that such substitution is not possible or does not provide the Authority
with the same rights in such proceedings as the Member Government would otherwise
have, then such substitution shall not occur.
(3) If the arbitrators' decision is issued prior to the date on which the
Primary Environmental Permit is issued, modified or renewed, the Authority
shall amend or withdraw its Primary Environmental Permit application to conform
with the arbitrators' decision. In such event, the Host Member Government
shall dismiss or otherwise withdraw from such proceedings.
(4) If the Primary Environmental Permit is issued, modified or renewed prior
to the date on which the arbitrators' decision is issued, the Authority shall
file and diligently pursue an application with the permitting agency to modify
the Primary Environmental Permit to conform with the arbitrators' decision
and shall, to the extent permitted by law, operate the Water Supply Facility
in conformance with the arbitrators' decision. In such event, there shall
be no additional Host Member Government arbitration with respect to the application
to modify the Primary Environmental Permit.
(F) It is expressly agreed that no Member Government shall
fund the participation of any third-party in an administrative or
judicial challenge to the matters described in this Section 3.12;
provided however, that this Section 3.12(F) shall not apply to EPC.
(G) If SWFWMD issues a Consolidated Permit and a condition of the Consolidated
Permit requires the Authority to file reports on conservation, per capita Water
use, reuse or similar matters requiring information from the Member Governments,
the Member Governments agree to supply the Authority with data, reports and
other information that will enable the Authority to comply with its reporting
requirements on a timely basis.
SECTION 3.13. PRIMARY
ENVIRONMENTAL PERMIT DISPUTES.
(A) If any Host Member Government opposes an Authority
application for a Primary Environmental Permit, such Host Member
Government shall notify the Authority in writing within thirty days
of the date on which the Board approves the application. If a Host
Member Government opposes the quantity of withdrawal, the notice
shall specify the quantity acceptable to the Host Member Government.
If the Primary Environmental Permit is a Consolidated Permit, any
Host Member Government may raise environmental issues affecting property
located within its own jurisdiction. If more than one Host Member
Government has raised environmental issues affecting property located
within its own jurisdiction, a separate arbitration shall be held
for each Host Member Government. The Authority will defer filing
its application for a period of ninety days following approval by
the Board, provided however, that if a notice of opposition is not
filed within thirty days of the date on which the Board approves
the application, the Authority may file its application at any time
thereafter.
(B) Following the receipt of any such notice, a binding arbitration shall be
conducted wherein the Authority shall have the burden of providing reasonable
assurance that the Authority's Primary Environmental Permit application meets
all applicable agency rules, policy and statutes. The Authority and each Host
Member Government shall pay the fees, charges and expenses of its own counsel
and witnesses. In addition, the Authority and each Host Member Government shall
pay or reimburse equal shares of the fees, charges and expenses of the arbitrators
and any experts engaged by the arbitrators.
(C) Except as provided in this Section 3.13(C), the Authority will amend or
withdraw its Primary Environmental Permit application (or if the Primary Environmental
Permit has been issued, apply for modification of the Primary Environmental
Permit) to conform with the arbitrators' decision.
(1) If amendment or withdrawal of the Primary Environmental
Permit modification or renewal application would result in a Production
Failure, the Authority shall not be required to amend or withdraw
the Primary Environmental Permit (or if the Primary Environmental
Permit has been issued, apply for modification of the Primary Environmental
Permit) until additional Water production facilities have been
placed in service to supply a quantity of additional Quality Water
that will permit compliance with the arbitrators' decision without
creating a Production Failure. The Authority shall immediately
initiate or accelerate its preparation of permit applications,
final design and construction of such additional Water production
facilities. If the Primary Environmental Permit is a Consolidated
Permit with two or more separate Host Member Government arbitrations,
an additional consolidated arbitration shall be conducted for the
purpose of determining the extent to which the production from
individual Water Supply Facilities will be reduced, without resulting
in a Production Failure, prior to the date on which the additional
Water production facilities are placed in service. Notwithstanding
the consolidated arbitration, the Authority shall immediately reduce
the production of the individual Water Supply Facilities to a level
which, in the Authority's best judgment, constitutes the least
amount of production possible without resulting in a Production
Failure. The Authority and each Host Member Government shall each
pay the fees, charges and expenses of its own counsel and witnesses
for the consolidated arbitration. In addition, the Authority and
each Host Member Government shall pay or reimburse equal shares
of the fees, charges and expenses of the arbitrators and any experts
engaged by the arbitrators for the consolidated arbitration.
(2) If the partnership agreement referenced in Section 3.21(D) hereof becomes
effective and if amendment or withdrawal of the Primary Environmental Permit
application would reduce the combined permitted withdrawal quantity of the
Partnership Plan Wellfields, on an average annual basis, to a quantity less
than 90 mgd prior to December 31, 2008, the Authority shall not be required
to amend or withdraw the Primary Environmental Permit (or if the Primary
Environmental Permit has been issued, apply for modification of the Primary
Environmental Permit) unless the amendment or withdrawal is approved by all
nine Directors. If the Primary Environmental Permit is a Consolidated Permit
with two or more separate Host Member Government arbitrations, an additional
consolidated arbitration shall be conducted for the purpose of determining
the extent to which the production from individual Water Supply Facilities
will be reduced, without reducing the combined permitted withdrawal quantity
of the Partnership Plan Wellfields, on an average annual basis, to a quantity
less than 90 mgd. The Authority and the Host Member Governments shall each
pay the fees, charges and expenses of its own counsel and witnesses for the
consolidated arbitration. The Authority shall pay the fees, charges and expenses
of the arbitrators and any experts engaged by the arbitrators for the consolidated
arbitration.
(D) The Member Governments have established binding arbitration,
as described in this Section 3.13, as the sole and exclusive method
of resolving all disputes between the Authority and a Host Member
Government relating to Primary Environmental Permits.
SECTION 3.14. OTHER
PERMIT DISPUTES. The Member Governments hereby retain
their individual right to participate directly in disputes related
to the issuance, modification, renewal or enforcement of any Environmental
Permit that is not a Primary Environmental Permit. Notwithstanding
the foregoing, all Member Governments shall be bound by the findings
of fact and conclusions of law included in any arbitrators' decision
issued pursuant to Section 3.13 hereof and waive any issue that
could have been resolved in an arbitration proceeding pursuant
to Section 3.13 hereof. Upon request of the Authority or any Member
Government, the Authority and all Member Governments agree to execute
a written stipulation to any findings of fact and conclusions of
law included in any arbitrators' decision issued pursuant to Section
3.13 hereof, in a form sufficient for filing with the appropriate
administrative or judicial officer in any subsequent dispute related
to the issuance, modification, renewal or enforcement of any Environmental
Permit.
SECTION 3.15. RESOLUTION OF RECLAIMED
WATER USE ISSUES.
(A) If any Member Government determines that a proposed
Authority Reclaimed Water Resource Project will have an adverse effect
upon the public health and safety of its retail and wholesale customers,
such Member Government shall notify the Authority in writing within
thirty days of the date on which the Board approves the Reclaimed
Water Resource Project; provided however, that any notice in connection
with the TWRRP shall be provided within thirty days of the date on
which the Board accepts the ecosystem team permit or within thirty
days of the date on which the conditions described in Sections 6.03(A)
and (D) hereof have been satisfied, whichever occurs later. Following
the receipt of any such notice, a binding arbitration shall be conducted
in accordance with this Section 3.15. Any and all issues related
to the Authority's ownership and operation of the proposed Reclaimed
Water Resource Project shall be raised and resolved in a single proceeding.
If the Host Member Government has challenged any Authority Reclaimed
Water Resource Project pursuant to Section 3.13 hereof, the arbitration
authorized by this Section 3.15 shall be consolidated with the arbitration
conducted pursuant to Section 3.13 hereof. The Authority will defer
filing any Primary Environmental Permit application for a period
of ninety days following approval by the Board- provided however,
that if a notice of opposition is not filed within thirty days of
the date on which the Board approves the Reclaimed Water Resource
Project, the Authority may file the Primary Environmental Permit
applications at any time thereafter. The Authority will amend or
withdraw all Primary Environmental Permit applications or Primary
Environmental Permits to conform with the arbitrators' decision.
(B) The arbitrators shall proceed to determine if the proposed Reclaimed Water
Resource Project threatens the public health and safety of the Member Governments'
retail and wholesale customers. The arbitrators may, at their discretion, and
shall, upon written request of the Member Government or the Authority, engage
experts to provide peer review of any scientific and technical studies introduced
by the parties.
(C) The fees, charges and expenses of the arbitrators, any experts engaged
by the arbitrators, the respective counsel engaged by the parties, and any
witnesses called by the parties shall be paid as follows:
(1) If a single Member Government opposes the Reclaimed
Water Resource Project and the arbitrators determine that Reclaimed
Water Resource Project does not threaten the public health and
safety of the Member Governments' retail and wholesale customers,
the Member Government shall pay or reimburse (a) the fees, charges
and expenses of its own counsel and witnesses- (b) the fees, charges
and expenses of the arbitrators and any experts engaged by the
arbitrators- and (c) the fees, charges and expenses of the Authority's
counsel and any witnesses called by the Authority.
(2) If a single Member Government opposes the Reclaimed Water Resource Project
and the arbitrators determine that Reclaimed Water Resource Project does
threaten the public health and safety of the Member Governments' retail and
wholesale customers, the Authority shall pay or reimburse (a) the fees, charges
and expenses of its own counsel and witnesses; (b) the fees, charges and
expenses of the arbitrators and any experts engaged by the arbitrators; and
(c) the fees, charges and expenses of the Member Government's counsel and
any witnesses called by the Member Government.
(3) If more than one Member Government opposes the Reclaimed Water Resource
Project and the arbitrators determine that Reclaimed Water Resource Project
does not threaten the public health and safety of the Member Governments'
retail and wholesale customers, each Member Government shall pay the fees,
charges and expenses of its own counsel and witnesses. In addition, each
Member Government shall pay or reimburse an equal share of (a) the fees,
charges and expenses of the arbitrators and any experts engaged by the arbitrators-
and (b) the fees, charges and expenses of the Authority's counsel and any
witnesses called by the Authority.
(4) If more than one Member Government opposes the Reclaimed Water Resource
Project and the arbitrators determine that Reclaimed Water Resource Protect
does threaten the public health and safety of the Member Governments' retail
and wholesale customers, the Authority shall pay or reimburse (a) the fees,
charges and expenses of its own counsel and witnesses; (b) the fees, charges
and expenses of the arbitrators and any experts engaged by the arbitrators;
and (c) the fees, charges and expenses of the Member Governments' counsel
and any witnesses called by the Member Governments.
(D) The Member Governments have established binding arbitration,
as described in this Section 3.15, as the sole and exclusive method
of resolving all disputes between the Authority and a Member Government
relating to the quality of Water provided from a Reclaimed Water
Resource Project.
SECTION 3.16. ARBITRATION PROCEDURE. All
binding arbitrations to be conducted pursuant to Sections 3.13 and
3.15 hereof shall be conducted in accordance with the procedure set
forth in this Section 3.16.
(A) Arbitrators shall be appointed as follows:
(1) If there is a single Member Government, the Authority and
the Member Government each shall appoint a person as arbitrator
within sixty days of the date on which the Board approves the
application. Each appointment shall be signified in writing to
the counter-party and the arbitrators so appointed, within ten
days of their appointment, shall appoint a third arbitrator,
who shall chair the panel. If the arbitrators appointed by the
parties are unable to agree upon a third arbitrator, the same
shall be appointed by the American Arbitration Association from
its qualified panel of arbitrators. If the Authority or the Member
Government fails to appoint an arbitrator within sixty days of
the date on which the Board approves the application, then an
arbitrator shall be appointed by the American Arbitration Association
from its qualified panel of arbitrators and the two so appointed
shall appoint a third arbitrator to chair the panel. None of
the arbitrators shall have a business or other pecuniary relationship
with either party, except for payment of the arbitrators' fees
and expenses.
(2) If there is more than one Member Government opposed to the application,
the Authority, individually, and the Member Governments, collectively,
shall each appoint a person as arbitrator within sixty days of the date
on which the Board approves the application. Each appointment shall be
signified in writing to the other parties and the arbitrators so appointed,
within ten days of their appointment, shall appoint a third arbitrator,
who shall chair the panel. If the arbitrators appointed by the parties
are unable to agree upon a third arbitrator, the same shall be appointed
by the American Arbitration Association from its qualified panel of arbitrators.
If the Authority, individually, or the Member Governments, collectively,
fail to appoint an arbitrator within sixty days of the date on which the
Board approves the application, then an arbitrator shall be appointed by
the American Arbitration Association from its qualified panel of arbitrators
and the two so appointed shall appoint a third arbitrator to chair the
panel. None of the arbitrators shall have a business or other pecuniary
relationship with any party, except for payment of the arbitrators' fees
and expenses.
(B) The three arbitrators shall be sworn to perform their duties
with impartiality and fidelity. The arbitrators may, at their discretion,
and shall, upon written request of a participating Member Government
or the Authority, engage experts to provide peer review of any
scientific and technical studies introduced by the parties. The
arbitration hearing shall convene not earlier than 90 days and
not later than 120 days of the appointment of the chair by the
two arbitrators chosen by the parties unless the Member Government
and the Authority agree to an earlier date. The arbitrators shall
render a decision within sixty days of the date on which the arbitration
hearing convenes, and such decision shall be in writing and in
duplicate, one counterpart thereof to be delivered simultaneously
to each of the parties. The decision shall contain findings of
fact and conclusions of law and shall be final and binding upon
the Authority and all participating Member Governments.
(C) Except to the extent inconsistent with this Section 3.16, the American
Arbitration Association standards shall apply to any arbitration proceedings
conducted under the provisions of Sections 3.13 and 3.15 hereof. Discovery
shall be conducted pursuant to the rules set forth in Appendix N hereto unless
all parties to the proceeding agree to modify such rules. The venue for any
such action shall be the county in which the Authority maintains its principal
office.
SECTION 3.17. LOCAL LAND USE DECISIONS.
In carrying out their statutorily conferred zoning, land use and
comprehensive planning powers and responsibilities, the Member Governments
shall not restrict or prohibit the use of land for Authority Water
supply purposes, including ground Water supply and the facilities
of third parties supplying Water to the Authority.
SECTION 3.18. TAXES, FEES, AND
SPECIAL ASSESSMENTS. The Member Governments shall not
impose any taxes, fees, or special assessments on Quality Water
produced by the Authority for delivery to the Member Governments.
This Section 3.18 shall not be construed to prohibit any taxes,
fees, or special assessments imposed by the Member Governments
in connection with the sale of Quality Water to customers of the
Member Governments.
SECTION 3.19. PRODUCTION FAILURE. Upon
the occurrence of a Production Failure, each affected Member Government
shall have the additional rights set forth in this Section 3.19.
(A) At its option, each Member Government may enter into
standby agreements to purchase Water from suppliers other than the
Authority. Member Governments shall accept all Quality Water delivered
by the Authority and shall exercise their right to purchase Water
from suppliers other than the Authority only in the event of a Shortfall
and to the extent of a Shortfall Amount.
(1) If less than all of the Member Governments experience a
Shortfall and any purchase agreement entered into in good faith
by a Member Government requires payment of a purchase price that
exceeds the uniform rate established pursuant to Section 3.04
hereof, the Member Government shall invoice the Authority for
amounts actually paid in excess of the uniform rate and the Authority
shall reimburse the Member Government for such amounts within
30 days of its receipt of such invoice.
(2) Any Member Government experiencing a Shortfall may Wheel Quality Water
acquired by the Member Government from suppliers other than the Authority
to the Member Government's Point of Connection.
(B) Each Member Government may elect, individually or in combination
with other Member Governments, to acquire and construct Water Supply
Facilities with a capacity necessary to protect itself against
a Shortfall.
(1) If a Member Government acquires or constructs a Water Supply
Facility pursuant to this Section 3.19(B) and a Shortfall occurs
with respect to such Member Government, the Authority shall purchase
the Water Supply Facility upon demand of such Member Government.
The purchase price shall be equal to the Member Government's
Actual Direct Cost to acquire and construct such Water Supply
Facilities. Upon receipt of any such demand, the Authority shall
use all reasonable efforts to issue Obligations at the earliest
practical date in an amount sufficient to fund the purchase price
and shall purchase the Water Supply Facility immediately upon
issuance of such Obligations.
(2) If a Member Government acquiring or constructing a Water Supply Facility
pursuant to this Section 3.19(B) elects not to demand its purchase by the
Authority upon the occurrence of a Shortfall or if the Authority is unable,
after applying all reasonable efforts, to issue Obligations sufficient
to purchase the Water Supply Facility, the Authority shall purchase the
Quality Water produced at the Water Supply Facility. The Authority and
the Member Government shall enter into a water supply agreement including,
among others, the following terms-.
(a) The rate in effect for each Fiscal Year shall be sufficient
to pay the Member Government's estimate of its Actual Direct
Cost for construction and treatment.
(b) All Quality Water produced at the Water Supply Facility shall be
delivered to and purchased by the Authority; provided however, that if
use of the Quality Water directly by the Member Government would avert
a Shortfall in respect of such Member Government, the Member Government
shall be entitled to use such Quality Water and Authority's right of
purchase shall be reduced by such amount.
(c) The Member Government shall maintain accounts and records of its
Actual Direct Cost. On or before each March 31, the Member Government
shall complete an audit of those accounts and provide a copy to the Authority
for review and comment. At its sole expense, the Authority may perform
its own audit of the appropriate accounts to support the Quality Water
charge. The Authority will notify the Member Government if it chooses
to pay for a separate audit.
(d) Following the end of each Fiscal Year, an annual adjustment in the
rate in effect during that Fiscal Year shall be computed on the basis
of the specific Actual Direct Cost incurred by the Member Government
in connection with the Quality Water delivered to the Authority during
the Fiscal Year then ended.
(e) If the audit determines that an overpayment has been made by the
Authority, the full amount of the overpayment shall be paid by the Member
Government to the Authority in three equal monthly installments, the
first of which shall be paid within thirty days of the date on which
the Member Government receives the audit. If the audit determines that
an underpayment has been made by the Authority, the full amount of the
underpayment shall be paid by the Authority to the Member Government
in three equal monthly installments, the first of which shall be paid
within thirty days of the date on which the Authority receives the audit.
(3) Any Member Government experiencing a Shortfall may Wheel
Quality Water produced by a Member Government's own Water Supply
Facilities to the Member Government's Point of Connection.
SECTION 3.20. REDUCTION OF ENVIRONMENTAL
STRESS.
(A) On December 15, 1997, the Authority approved an agreement
with Tampa that will allow an increase in the quantity of Water
that can be purchased by the Authority from Tampa. Upon completion
of the Tampa/Hillsborough Interconnect Project, the Authority shall
purchase the maximum quantity of Water available from Tampa. Due
to Tampa's reliance on surface Water sources, it is understood
that Water will only be available from Tampa on a seasonal or otherwise
interruptible basis. Subject to the limitations of the Authority's
Water delivery system, 65 percent of all Rotational Capacity created
by the purchase of Water from Tampa shall be applied immediately,
on an average annual basis, to reduce the quantity of Water withdrawn
from the Cross Bar Ranch Wellfield and Cypress Creek Wellfield
and 35 percent of all Rotational Capacity created by the purchase
of Water from Tampa shall be applied immediately, on an average
annual basis, to reduce the quantity of Water withdrawn from wellfields
located in Hillsborough County. Pasco and Hillsborough acknowledge
that this Section 3.20(A) creates an interim preferential reduction
in the quantity of Water withdrawn from the Cross Bar Ranch Wellfield,
the Cypress Creek wellfield and wellfields located in Hillsborough
County that will be superseded, on a gallon-for-gallon basis, to
the extent the quantity of Water withdrawn is actually reduced
by the Rotational Capacity and Replacement Capacity created by
implementation of the Master Water Plan, as described in Section
3.20(E) hereof.
(B) The parties acknowledge that the Master Water Plan has multiple purposes,
including: (1) development of a Quality Water supply that is sufficient to
meet the current and future needs of the Member Governments, (2) development
of Replacement Capacity to permanently reduce the permanent combined production
from the Partnership Plan Wellfields, and (3) development of Rotational Capacity
that can be used to periodically reduce the withdrawal of Water from Authority
wellfields located in environmentally stressed areas. Recognizing the importance
of developing Replacement Capacity and Rotational Capacity, the parties agree
that the Authority shall make all reasonable efforts to implement a Master
Water Plan prior to December 31, 2007, that produces 42.5 mgd of Replacement
Capacity, on an average annual basis, and a total of at least 85 mgd of Quality
Water, on an average annual basis, that is not available on the date hereof.
(C) If the Authority fails to develop 42.5 mgd of Replacement Capacity prior
to December 31, 2007, any Member Government may acquire and construct Water
Supply Facilities with a production capacity, on an average annual basis,
less than or equal to the difference between 42.5 mgd and the Replacement
Capacity theretofore created by the Authority. The Water Supply Facilities
acquired or constructed pursuant to this Section 3.20(C) shall be sold to
and purchased by the Authority at a purchase price equal to the Member Government's
Actual Direct Cost to acquire and construct such Water Supply Facilities.
Upon purchase, such Water Supply Facilities shall be used by the Authority,
to the extent necessary, to meet its Replacement Capacity obligation.
(D) The Authority and the Member Governments are currently negotiating a
partnership agreement with SWFWMD, pursuant to which SWFWMD is expected to
provide up to $183,000,000 to be used by the Authority for the development
of new alternative Water Supply Facilities and regionally significant transmission
pipelines. If the partnership agreement becomes effective and the Authority
receives the anticipated funding:
(1) by December 31, 2002, the Authority shall reduce the combined
production and permitted quantity from the Partnership Plan Wellfields
to 121 mgd, on an average annual basis (to be measured from December
31, 2002 to December 31, 2003), and maintain production thereafter
at or below 121 mgd, on an average annual basis; and
(2) by December 31, 2007, the Authority shall reduce the combined production
and permitted quantity from the Partnership Plan Wellfields to 90 mgd,
on an average annual basis (to be measured from December 31, 2007 to December
31, 2008), and maintain production thereafter at or below 90 mgd, on an
average annual basis.
If the partnership agreement with SWFWMD imposes the same production limitations
and includes provisions for extending the time required to comply with
such production limitations, the time for compliance with this Section
3.20(D) shall be subject to extension in the same manner as the production
limitations imposed by the partnership agreement.
(E) Replacement Capacity and Rotational Capacity will
be used to reduce the quantity of Water withdrawn from wellfields
in areas of environmental stress, in accordance with the priorities
established in this Section 3.20(E).
(1) The Authority shall develop a Wellfield Operations
Plan, which shall comply with all applicable requirements of this
Agreement. Subject to the provisions of Section 3.20(E)(2) hereof,
all Replacement Capacity and Rotational Capacity shall be applied
in accordance with the wellfield operations plan approved by the
Authority.
(2) Notwithstanding the provisions of Section 3.20(E)(!) hereof, prior to
the date on which the Authority reduces the combined production from the
Partnership Plan Wellfields to 121 mgd, on an average annual basis: (a) not
less than forty percent of the Replacement Capacity shall be applied, on
an average annual basis, to reduce the quantity of Water withdrawn from wellfields
located in Pasco County; (b) not less than twenty percent of the Replacement
Capacity shall be applied, on an average annual basis, to reduce the quantity
of Water withdrawn from wellfields located in Hillsborough County' and (c)
not less than ten percent of the Replacement Capacity shall be applied, on
an average annual basis, to reduce the quantity of Water withdrawn from wellfields
located in Pinellas County. The remaining thirty percent of the Replacement
Capacity shall be applied, on an average annual basis, in accordance with
the Wellfield Operations Plan.
(F) It is expressly acknowledged and agreed by the parties
that Rotational Capacity will not be available to reduce the quantity
of Water withdrawn from existing Wellfields unless the Quality Water
needs of the Member Governments have been fully satisfied.
(G) The parties acknowledge that the Authority's ability to implement the provisions
of this Section 3.20 is subject in all respects to the regulatory power of
SWFWMD and other State and federal agencies having jurisdiction over the Authority.
SECTION 3.21. IMPACT FEES FOR
AUTHORITY FACILITIES. The parties acknowledge that Economic
Impact Facilities will have a significant economic impact on
the Member Government in which they are located and agree that
the Authority should compensate such Member Governments for the
financial loss in accordance with this Section 3.21. Prior to
April 1 of each year, starting with April 1, 1999, the Authority
shall make an economic impact payment for each Economic Impact
Facility, which shall be computed by multiplying (1) the sum
of (a) the actual initial construction cost of the Economic Impact
Facility, and (b) the assessed value of the property on which
the Economic Impact Facility is located for the last year in
which such property was subject to ad valorem taxation, by (2)
a factor of.0005; provided however, that the amount payable for
any Economic Impact Facility shall not exceed $500,000. If the
Economic Impact Facility is located in an unincorporated area
or within the corporate limits of a municipality that is not
a Member Government, the full payment shall be made to the Member
Government county in which the Economic Impact Facility is located.
If the Economic Impact Facility is located with the corporate
limits of a Member Government municipality, the economic impact
payment shall be divided equally between the Member Government
county and the Member Government municipality in which the Economic
Impact Facility is located.
ARTICLE IV
OBLIGATIONS
SECTION 4.01. GENERAL
AUTHORITY. The Board shall have the power and is hereby
authorized to provide, at one time or from time to time in series,
for the issuance of Obligations of the Authority to fund the Project
Cost of Water Supply Facilities. Other than Obligations described
in Section 4.09 hereof, the principal of and interest on each series
of Obligations shall be payable from Pledged Funds.
SECTION 4.02. TERMS OF THE OBLIGATIONS. The
Obligations shall be dated, shall bear interest at such rate or
rates, shall mature at such times as may be determined by the Board,
and may be made redeemable before maturity, at the option of the
authority, at such price or prices and under such terms and conditions
as may be fixed by the Board. Said Obligations shall mature not
later than 30 years after their issuance and may, at the option
of the Board, bear interest at a variable rate. The Board shall
determine the form of the Obligations, the manner of executing
such Obligations, and shall fix the denominations of such obligations,
the place or places of payment of the principal and interest, which
may be at any bank or trust company within or outside of the State,
and such other terms and provisions of the Obligations as it deems
appropriate. The Obligations may be sold at public or private sale
for such price or prices as the Board shall determine.
SECTION 4.03. TEMPORARY OBLIGATIONS. Prior
to the preparation of definitive Obligations of any series, the
Board may, under like restrictions, issue interim receipts, interim
certificates, or temporary Obligations, exchangeable for definitive
Obligations when such Obligations have been executed and are available
for delivery. The Board may also provide for the replacement of
any Obligations which shall become mutilated, destroyed or lost.
Obligations may be issued without any other proceedings or the
happening of any other conditions or things than those proceedings,
conditions or things which are specifically required by this Agreement.
SECTION 4.04. ANTICIPATION NOTES. In
anticipation of the sale of Obligations, the Board may issue notes
and may renew the same from time to time. Such notes may be paid
from the proceeds of the Obligations, the Pledged Funds, the proceeds
of the note and such other legally available moneys as the Board
deems appropriate. Said notes shall mature within five years of
their issuance and shall bear interest at a rate not exceeding
the maximum rate provided by law. The Board may issue Obligations
or renewal notes to repay the notes. The notes shall be issued
in the same manner as the Obligations.
SECTION 4.05. TAXING POWER NOT
PLEDGED. Obligations issued under the provisions of this
Agreement shall not be deemed to constitute a pledge of the faith
and credit of the Authority or any Member Government, but such
Obligations shall be payable only from Pledged Funds in the manner
provided herein and by the Financing Documents. The issuance of
Obligations under the provisions of this Agreement shall not directly
or indirectly obligate any Member Government to levy or to pledge
any form of ad valorem taxation whatever therefor. No holder of
any such Obligations shall ever have the right to compel any exercise
of the ad valorem taxing power on the part of any Member Government
to pay any such Obligations or the interest thereon or to enforce
payment of such Obligations or the interest thereon against any
property of the Authority, nor shall such Obligations constitute
a charge, lien or encumbrance, legal or equitable, upon any property
of the Authority, except the Pledged Funds.
SECTION 4.06. TRUST FUNDS. Upon
issuance of any series of Obligations, the Pledged Funds shall
be deemed to be trust funds, to be held and applied solely as provided
in the Financing Documents. The Pledged Funds may be invested by
the Authority, or its designee, in the manner provided by the Financing
Documents. The Pledged Funds upon receipt thereof by the Authority
shall be subject to the lien and pledge of the holders of any Obligations
or any entity other than the Authority providing credit enhancement
on the Obligations.
SECTION 4.07. REMEDIES OF HOLDERS.
Any holder of Obligations, except to the extent the rights herein
given may be restricted by the Financing Documents, may, whether
at law or in equity, by suit, action, mandamus or other proceedings,
protect and enforce any and all rights under the laws of the State
or granted hereunder or under the Financing Documents, and may
enforce and compel the performance of all duties required hereunder
or under the Financing Documents, to be performed by the Authority.
SECTION 4.08. REFUNDING OBLIGATIONS.
The Authority may issue Obligations to refund any Obligations then
outstanding and provide for the rights of the holders hereof. Such
refunding Obligations may be issued in an amount sufficient to
provide for the payment of the principal of, redemption premium,
if any, and interest on the outstanding Obligations to be refunded.
SECTION 4.09. CONDUIT TRANSACTIONS. In
addition to the powers granted to the Authority hereunder, including
the power to issue Obligations pursuant to this Article IV for
the purpose of funding Project Costs of Water Supply Facilities,
the Authority may issue Obligations for the principal purpose of
loaning the proceeds thereof to a public or private entity, which
shall finance or refinance the acquisition and construction of
water treatment, production or transmission facilities, including,
but not limited to, a desalination facility. Water from such facilities
shall be purchased in whole or in part by the Authority for purposes
of supplying Quality Water to the Member Governments. Such Obligations
shall be secured in such manner as determined by the Board. Such
security may include moneys received pursuant to a loan agreement
between the Authority and such public or private entity. Such Obligations
shall have the terms provided in Section 4.02 hereof.
SECTION 4.10. MEMBER GOVERNMENT
COOPERATION. Each Member Government shall cooperate with
the Authority when the Authority issues Obligations. In such connection,
each Member Government and the Authority shall comply with reasonable
requests of each other and will, upon request of the Authority:
(A) make available general and financial information about itself;
(B) consent to publication and distribution of its financial information;
(C) certify that its general and financial information is accurate,
does not contain any untrue statements of a material fact and does
not omit to state a material fact necessary to make the statements
in the information, in light of circumstances under which they
were made, not misleading; (D) make available certified copies
of official proceedings; (E) provide reasonable certifications
to be used in a transcript of closing documents; and (F) provide
and pay for reasonable requested certificates and/or opinions of
counsel as to the validity of its actions taken in respect to and
the binding effect of this Agreement and the Master Water Supply
Contract, title to its Water supply system, pending litigation
which could materially affect its performance hereunder.
ARTICLE V
TRANSFER OF ASSETS
SECTION 5.01. TRANSFER OF ST. PETERSBURG
FACILITES. St. Petersburg agrees to convey its interest
in the South Pasco Wellfield (including 16.90 mgd of production
capacity and related wellhead sites), Section 21 Wellfield (including
12.00 mgd of production capacity and related wellhead sites), Cosme
Odessa Wellfield (including 12.00 mgd of production capacity and
related wellhead sites), and 42" Transmission Main at a purchase
price of $119,518,814. Pursuant to the St. Petersburg Transfer
Agreement and without additional consideration, St. Petersburg
will (A) convey any necessary access easements, easements for transmission
facilities, and easements for monitoring wells, and (B) impose
restrictive covenants on any remaining wellfield property. The
total purchase price for these Transferred Assets also includes
a $1,000,000 Disinfection Credit. The parties acknowledge and agree
that the Disinfection Credit was negotiated as an integral part
of the purchase price for the foregoing Transferred Assets. A specific
description of the Transferred Assets to be conveyed and the terms
and conditions of sale are set forth in the St. Petersburg Transfer
Agreement attached as Appendix C. St. Petersburg and the Authority
shall be bound by the terms and provisions of the St. Petersburg
Transfer Agreement. It is understood and agreed that the purchase
price set forth above includes consideration for any equity interest
St. Petersburg may have in the Existing Authority System (other
than any payments remaining under the agreements listed in Section
6.03(A)(7) hereof), which shall be relinquished without further
action of St. Petersburg upon satisfaction of the conditions described
in Section 6.03(D) hereof.
SECTION 5.02. TRANSFER OF PINELLAS
FACILITIES. Pinellas agrees to convey its interest in
the Eldridge-Wilde Wellfield (including 35.24 mgd of production
capacity and related wellhead sites), and Cross Bar Ranch Wellfield
(wellhead sites related to current production capacity) at a purchase
price of $140,007,394. Pursuant to the Pinellas Transfer Agreements
and without additional consideration, Pinellas will (A) convey
any necessary access easements, easements for transmission facilities,
and easements for monitoring wells, and (B) impose restrictive
covenants on any remaining wellfield property. The total purchase
price for these Transferred Assets also includes a $2,000,000 Disinfection
Credit. The parties acknowledge and agree that the Disinfection
Credit was negotiated as an integral part of the purchase price
for the foregoing Transferred Assets. A specific description of
the Transferred Assets to be conveyed and the terms and conditions
of sale are set forth in the Pinellas Transfer Agreements attached
as Appendices D-1 and D-2. Pinellas and the Authority shall be
bound by the terms and provisions of the Pinellas Transfer Agreements.
It is understood and agreed that the purchase price set forth above
includes consideration for any equity interest Pinellas may have
in the Existing Authority System (other than any payments remaining
under the agreements listed in Section 6.03(A)(7) hereof), which
shall be relinquished without further action of Pinellas upon satisfaction
of the conditions described in Section 6.03(D) hereof.
SECTION 5.03. TRANSFER OF TAMPA
FACILITY. Tampa agrees to convey its interest in the Morris
Bridge Wellfield (including 15.50 mgd of production capacity) at
a purchase price of $35,4a30,365. Pursuant to the Tampa Transfer
Agreement and without additional consideration, Tampa will (A)
convey any necessary access easements, easements for transmission
facilities, and easements for monitoring wells, and (B) impose
restrictive covenants on any remaining wellfield property. The
total purchase price for these Transferred Assets also includes
a $1,000,000 Disinfection Credit. The parties acknowledge and agree
that the Disinfection Credit was negotiated as an integral part
of the purchase price for the foregoing Transferred Assets. A specific
description of the Transferred Asset to be conveyed and the terms
and conditions of sale are set forth in the Tampa Transfer Agreement
attached as Appendix E. Tampa and the Authority shall be bound
by the terms and provisions of the Tampa Transfer Agreement. It
is understood and agreed that the purchase price set forth above
includes consideration for any equity interest Tampa may have in
the Existing Authority System, which shall be relinquished without
further action of Tampa upon satisfaction of the conditions described
in Section 6.03(D) hereof.
SECTION 5.04. TRANSFER OF PASCO
FACILITY. Pasco agrees to convey its interest in the North
Pasco Wellfield (including 6.60 mgd of production capacity and
related wellhead sites) at a purchase price of $32,235,683. Pursuant
to the Pasco Transfer Agreement and without additional consideration,
Pasco will (A) convey any necessary access easements, easements
for transmission facilities, and easements for monitoring wells,
and (B) impose restrictive covenants on any remaining wellfield
property. The total purchase price for these Transferred Assets
also includes a $3,000,000 Disinfection Credit. The parties acknowledge
and agree that the Disinfection Credit was negotiated as an integral
part of the purchase price for the foregoing Transferred Assets.
A specific description of the Transferred Asset to be conveyed
and the terms and conditions of sale are set forth in the Pasco
Transfer Agreement attached as Appendix F. Pasco and the Authority
shall be bound by the terms and provisions of the Pasco Transfer
Agreement. It is understood and agreed that the purchase price
set forth above includes consideration for any equity interest
Pasco may have in the Existing Authority System, (other than any
payments remaining under the agreements listed in Section 6.03(A)(7)
hereof) which shall be relinquished without further action of Pasco
upon satisfaction of the conditions described in Section 6.03(D)
hereof.
SECTION 5.05. TRANSFER OF HILLSBOROUGH
FACILITIES. Hillsborough agrees to convey its interest
in the Crippenwood Well, Manors of Crystal Lake Well, Eagles Well,
Truman Well, Bloomingdale Well and Highview Well (including 1.392
mgd of total production capacity and related wellhead sites) at
a purchase price of $19,325,973. Pursuant to the Hillsborough Transfer
Agreement and without additional consideration, Hillsborough will
(A) convey any necessary access easements, easements for transmission
facilities, and easements for monitoring wells, and (B) impose
restrictive covenants on any remaining wellfield property. The
total purchase price for these Transferred Assets also includes
a $3,000,000 Disinfection Credit. A specific description of the
Transferred Asset to be conveyed and the terms and conditions of
sale are set forth in the Hillsborough Transfer Agreement attached
as Appendix G. Hillsborough and the Authority shall be bound by
the terms and provisions of the Hillsborough Transfer Agreement.
It is understood and agreed that the purchase price set forth above
includes consideration for any equity interest Hillsborough may
have in the Existing Authority System, which shall be relinquished
without further action of Hillsborough upon satisfaction of the
conditions described in Section 6.03(D) hereof.
SECTION 5.06. TRANSFER OF NEW PORT
RICHEY FACILITIES. New Port Richey agrees to convey its
interest in the North Pasco Wellfield (including 1.40 mgd of total
production capacity and related wellhead sites) at a purchase price
of $13,226,250. Pursuant to the New Port Richey Transfer Agreement
and without additional consideration, New Port Richey will (A)
convey any necessary access easements, easements for transmission
facilities, and easements for monitoring wells, and (B) impose
restrictive covenants on any remaining wellfield property. The
total purchase price for these Transferred Assets also includes
a $500,000 Disinfection Credit. A specific description of the Transferred
Asset to be conveyed and the terms and conditions of sale are set
forth in the New Port Richey Transfer Agreement attached as Appendix
H. New Port Richey and the Authority shall be bound by the terms
and provisions of the New Port Richey Transfer Agreement. It is
understood and agreed that the purchase price set forth above includes
consideration for any equity interest New Port Richey may have
in the Existing Authority System, (other than any payments remaining
under the agreements listed in Section 6.03(A)(7) hereof) which
shall be relinquished without further action of New Port Richey
upon satisfaction of the conditions described in Section 6.03(D)
hereof.
SECTION 5.07. PERMITS FOR TRANSFERRED
ASSETS. The Member Governments acknowledge that this Agreement
will be terminated if the Transferred Assets are not conveyed to
the Authority on or prior to the Full Implementation Date. In order
to facilitate the completion of these conveyances, the Member Governments
agree to support all Environmental Permits necessary to complete
the conveyances.
SECTION 5.08. OPTION TO PURCHASE TRANSFERRED ASSETS. The
Authority shall not sell a Transferred Asset unless it is no longer used to
supply Water. In such event, the Transferred Asset shall be appraised by two
independent appraisers and, not less than ninety days prior to the date on
which the Authority intends to offer the Transferred Asset for sale, the Authority
shall provide notice (including copies of the appraisal reports) to the Member
Government that conveyed the Transferred Asset to the Authority. The Member
Government that conveyed the Transferred Asset to the Authority shall have
an option to repurchase the Transferred Asset upon payment of an amount equal
to the lower of (A) the average of the two appraised values, and (B) the price
paid by the Authority, after deducting that portion of the purchase price attributable
to (1) the Disinfection Credit, and (2) any equity interest the member government
may have had in the Existing Authority System (other than any payments remaining
under the agreements listed in Section 6.03(A)(7) hereof). On or prior to the
date on which the Authority intends to offer the Transferred Asset for sale,
as specified in the notice, the Member Government may exercise its repurchase
option. This option shall expire if not exercised by the Member Government
in a timely manner.
SECTION 5.09. TRANSFER OF AUTHORITY
FACILITIES.
(A) The Authority agrees to convey to Hillsborough its
interest in the South Central Hillsborough Transmission Main, the
South Central Hillsborough Pump Station, the Cargill interconnect,
and that portion of the Tampa/Hillsborough interconnect lying on
the Hillsborough side of the pump station. A specific description
of the foregoing Water Supply Facilities and the terms and conditions
of transfer not included in this Section 5.09(A) are set forth in
the Authority/Hillsborough Transfer Agreement attached as Appendix
I. The Authority and Hillsborough shall be bound by the terms and
provisions of the Authority/Hillsborough Transfer Agreement.
(B) The Authority agrees to convey to Pasco, without consideration, its interest
in the West Pasco Transmission Main. A specific description of the West Pasco
Transmission Main and the terms and conditions of transfer are set forth in
the Authority/Pasco Transfer Agreement attached as Appendix J. The Authority
and Pasco shall be bound by the terms and provisions of the Authority/Pasco
Transfer Agreement.
(C) The Authority agrees to convey to Tampa, without consideration, its interest
in that portion of the Tampa/Hillsborough Interconnect lying on the Tampa side
of the pump station. A specific description of that portion of the Tampa/Hillsborough
Interconnect lying on the Tampa side of the pump station and the terms and
conditions of transfer are set forth in the Authority/Tampa Transfer Agreement
attached as Appendix K. The Authority and Tampa shall be bound by the terms
and provisions of the Authority/Tampa Transfer Agreement.
SECTION 5.10. JOINT USE OF AUTHORITY
EASEMENTS. The Authority shall not unreasonably withhold
joint use of an easement requested by a Member Government if the
joint use is not in conflict with the Authority's existing and
anticipated future use.
SECTION 5.11. FORM OF PAYMENT FOR
TRANSFERRED ASSETS. It is understood and agreed that unless
a Member Government has notified the Authority prior to July 1,
1998 or seven days following date on which it approves execution
of this Agreement, whichever is later, of its election to be compensated
in cash for the conveyance of Transferred Assets to the Authority,
payment shall be made in the form of credits applied to reduce
the cost or purchasing Quality Water from the Authority, as set
forth in Section 3.04(A)(3) hereof. Member Governments may elect
to be paid in cash for any specific Transferred Asset or for that
portion of the purchase price that represents such Member Government's
Disinfection Credit. Notwithstanding the foregoing, no cash payment
to a Member Government shall adversely affect the federal tax exemption
of interest on the Obligations issued by the Authority to finance
a cash acquisition of Transferred Assets; all proposed cash payments
shall be subject to review by the Authority's bond counsel as to
whether such cash payment will adversely affect its opinion as
to the federal tax exemption of interest on such Obligations. If
any member Government conveying Transferred Assets to the Authority
elects to be compensated in cash, the purchase price for such Transferred
Assets shall be reduced by a prorata share of the actual cost incurred
by the Authority in connection with the issuance of Obligations
to finance a cash acquisition of Transferred Assets.
ARTICLE VI
GENERAL PROVISIONS
SECTION 6.01. FILING. A
copy of this Agreement shall be filed for record with the Clerk of
the Circuit Court in Hillsborough County, Pasco County and Pinellas
County.
SECTION 6.02. TERMS OF AGREEMENT. This
Agreement shall become effective in the manner set forth in Sections
67.03(A) and (D) hereof and, unless terminated earlier pursuant
to Section 6.03(E) or Section 6.04 hereof, expire upon the later
of the following dates: (A) the fortieth anniversary of the commencement
date hereof, or (B) the date on which no Obligations remain outstanding
pursuant to the Financing Documents.
SECTION 6.03. TRANSITION PROVISIONS.
(A) This Agreement shall become effective upon occurrence
of the following events; provided however, that Sections 3.02 through
3.04 hereof shall not become effective until the events described
in Section 6.03(D) have occurred:
(1) a final order has been entered by the Department
of Environmental Protection approving this Agreement and the applicable
time periods to request administrative hearings or to initiate
appellate proceedings therefrom have expired;
(2) the specific legislation attached hereto as Appendix M, relating to enforceability
of certain provisions hereof, has been enacted and become effective (other
than the provisions relating to the Authority's use of Part II, Chapter 159,
Florida Statutes, the enactment of which shall not be a condition precedent
to the effectiveness of this Agreement) either as an independent legislative
act or as part of a broader legislative act;
(3) Pasco has repealed its desalination fee ordinance.
(4) Pasco has modified its comprehensive plan to eliminate provisions that
permit Pasco to restrict or prohibit the use of land for Water supply purposes,
including ground Water Supply.
(5) The Authority and Member Governments have held public hearing, if required,
pursuant to Sections 125.3401, 180.301 and 189.423, Florida Statutes prior
to executing the transfer agreements.
(6) The Authority, the Member Governments and EPC have executed and delivered
the EPC Agreement.
(7) Either the following agreements between SWFWMD and the Authority and/or
its Member Governments have been modified to the extent necessary to permit
the transfer of the Member Government's wellfield interests to the Authority
and to eliminate any special rights to the delivery of Water t6hat would
be inconsistent with terms of this Agreement, or the Member Governments,
with consent from SWFWMD, have transferred or assigned to the Authority their
rights in those agreements which are in conflict or inconsistent with this
Agreement and the Master Waster Supply Contract.
(a) Morris Bridge Wellfield Agreement among SWFWMD,
the Hillsborough River Basin Board and Tampa, dated April 22,
1970;
(b) Easement Agreement (Morris Bridge Wellfield) between SWFWMD and Tampa,
dated October 8, 1975;
(c) Agreement for Development and Operation of the Cypress Creek Wellfield
among SWFWMD, SWFWMD (Regulatory), Pinellas, Pasco and St. Petersburg,
dated November 14, 1973;
(d) Cypress Creek Wellfield Agreement between St. Petersburg and the
Authority, dated November 22, 1976;
(e) Cypress Creek Wellfield Agreement between Pinellas and the Authority,
dated November 22, 1976.
(f) Cypress Creek Wellfield Agreement between Pasco and the Authority,
dated March 22, 1977;
(g) License Agreement for the Cypress Creek Wellfield among SWFWMD, the
Hillsborough River Basin Board, the Pinellas-Anclote River Basin Board
and the Authority, dated July 10, 1979.
(h) Cypress Creek Wellfield License Agreement between SWFWMD and the
Authority, dated March 18, 1991; and First Amendment to Cypress Creek
Wellfield License Agreement between SWFWMD and the Authority, dated March
1, 1992;
(i) Starkey Wellfield Agreement between SWFWMD and New Port Richey, dated
August 16, 1972.
(j) Starkey Wellfield Agreement between SWFWMD and New Port Richey, dated
March 26, 1974; Supplemental Starkey Wellfield Agreement between SWFWMD
and New Port Richey, dated July 16, 1974; and Starkey Wellfield Addendum
Agreement between SWFWMD and New Port Richey, dated March 2, 1977;
(k) Starkey Wellfield Agreement between Pasco and New Port Richey, dated
August 31, 1978;
(l) Water Transfer and Management Agreement among SWFWMD, New Port Richey
and the Authority, dated December 15, 1981;
(m) Starkey Wellfield Water Supply Contract among Pasco, New Port Richey
and the Authority, dated December 15, 1981; first Amendment to Starkey
Wellfield Water Supply Contract among Pasco, New Port Richey and the
Authority, dated October 29, 1982; and Second Amendment to Starkey Wellfield
Water Supply Contract among Pasco, New Port Richey and the Authority,
dated June 7, 1988;
(n) Starkey Wellfield License Agreement between SWFWMD and the Authority,
dated May 17, 1993; and
(o) South Pasco Wellfield License Agreement between St. Petersburg and
SWFWMD, dated October 9, 1989. Upon satisfaction of the conditions set
forth in this Section 6.03(A), the Authority shall provide written notice
to the Member Governments.
(B) It is understood and agreed that the Member Governments
will support (1) approval of this Agreement by the Department of
Environmental Protection; (2) enactment of the legislation attached
hereto as Appendix M hereof; and (3) amendment of the agreements
specified in Section 6.03(A)(7) hereof. It is further understood
and agreed that no Member Government shall fund the participation
of any third-party in opposition to such matters.
(C) Between the date on which the conditions described in Sections 6.03(A)
hereof have been satisfied and the Full Implementation Date, the Member Governments
agree to waive all termination rights and other remedies that otherwise would
result from the reorganization of the Authority to be implemented hereunder
under the terms of any prior agreements by and among the Authority, SWFWMD
and the member Governments, individually or collectively, including but not
limited to the agreements listed below; provided however, that all other rights
and obligations of the Authority and the Member Governments shall remain in
full force and effect:
(1) St. Petersburg Cypress Creek Agreement between the
Authority and St. Petersburg, dated November 22, 1976
(2) Pinellas Cypress Creek Agreement between the Authority and Pinellas County,
dated November 22, 1976;
(3) Pasco Cypress Creek Agreement between the Authority and Pasco County,
dated March 22, 1977;
(4) Pinellas County Agreement between the Authority and Pinellas County,
dated November 8, 1977.
(5) Hillsborough County Agreement between the Authority and Hillsborough
County, dated August 28, 1980;
(6) St. Petersburg Contract between the Authority and St. Petersburg, dated
September 17, 1980;
(7) Water Supply Contract for Hillsborough County between the Authority and
Hillsborough County, dated November 10, 1981, and the First through Eleventh
Amendments thereto;
(8) Water Transfer and Management Agreement for Starkey Wellfield between
the Authority, New Port Richey and the Southwest Florida Water Management
District, dated December 18, 1981.
(9) St. Petersburg Water Exchange Contract between the Authority and St.
Petersburg, dated December 4, 1981 and the First Amendment thereto, dated
April 14, 1984;
(10) Water Supply Contract for Tampa By-Pass Canal between the Authority
and Tama, dated January 17, 1985;
(11) Operation and Management Agreement for Cosme-Odessa and Section 21 Wellfields
between the Authority and St. Petersburg, dated March 16, 1987.
(12) Second Amendment to Water Supply Agreement for Starkey Wellfield between
the Authority, Pasco County and New Port Richey, dated June 7, 1988;
(13) South Central Pasco Water Supply Contract between the Authority and
Pasco County, dated June 7, 1988;
(14) Pasco County Excess Water Supply Contract between the Authority and
Pasco County, dated November 1, 1988;
(15) North Pasco Regional Wellfield Water Supply Contract between the Authority,
Pasco County and New Port Richey, dated January 23, 1990;
(16) Cross Bar Ranch Wellfield Water Supply Contract between Pinellas and
the Authority, dated April 11, 1979, and the amendment thereto dated January
19, 1980, and
(17) Regional System Water Supply Contract between Pinellas, Pasco, Hillsborough,
Tampa, St. Petersburg and the Authority, dated July 24, 1991.
(D) As soon as practicable following the date on which
the conditions described in Sections 6.03(A) hereof have been satisfied.
(1) the Authority shall issue tax-exempt Obligations (notwithstanding
the prevailing rate of interest or other market factors) to refund
its outstanding capital indebtedness, including but not limited
to its Capital Improvement Revenue Bonds, Series 1979, Refunding
Revenue Bonds Series 1989A, Capital Improvement Revenue Bonds,
Series 1989B, Refunding Revenue Bonds, Series 1992, Refunding
Revenue Bonds, Series 1995, Revenue Note, Series 1997, Cypress
Creek Capital Lease Obligation, Starkey Wellfield Capital Lease
Obligation and Series 1991 Revenue Notes; and
(2) subject to the post-closing rights and remedies provided therein, all
conveyances required by the St. Petersburg Transfer Agreement, Pinellas
Transfer Agreements, Tampa Transfer Agreement, Pasco Transfer Agreement,
Hillsborough Transfer Agreement, New Port Richey Transfer Agreement, Authority/Hillsborough
Transfer Agreement, Authority/Pasco Transfer Agreement and Authority/Hillsborough
Transfer Agreement shall be closed simultaneously.
(E) If the conditions described in Sections 6.03(A) and
(D) hereof are not satisfied on or prior to the Full Implementation
Date, this agreement shall be terminated. In such event, this Agreement
and the Master Water Supply Contract shall be deemed void ab initio
and all documents held in escrow pursuant to the St. Petersburg Transfer
Agreement, Pinellas Transfer Agreements, Tampa Transfer Agreement,
Pasco Transfer Agreement, Hillsborough Transfer Agreement, New Port
Richey Transfer Agreement, Authority/Hillsborough Transfer Agreement,
Authority/Pasco Transfer Agreement and Authority/Hillsborough Transfer
Agreement shall be returned to the party providing such document.
Unless modified by the Authority following the termination hereof,
all actions taken by the Board between date on which the conditions
described in Sections 7.03(A) hereof have been satisfied and the
Full Implementation Date shall remain in full force and effect. Notwithstanding
any other provision of this Agreement to the contrary, the Board
may extend the Full Implementation Date, from time to time, by unanimous
vote.
(F) Unless otherwise approved by both Pasco and Pinellas, the Authority shall
continue to provide chlorination and pH stabilization at the Cypress Creek
Water Treatment Plan for a period of 30 months following satisfaction of the
conditions described in Sections 6.03(A) and (D) hereof. During this period,
the rate charged to Pasco and Pinellas for Quality Water delivered from the
Cypress Creek Water Treatment Plant will be increased, as contemplated by Section
3.04(A)(2) hereof, to reflect the Authority's Actual Direct Cost of providing
this additional treatment. For purposes of this Section 6.03(F), the parties
stipulate that the Authority's Actual Direct Cost is $0.02 per thousand gallons.
(G) The Authority will deliver chlorinated and stabilized water to Pasco from
the Lake Bridge Water Treatment Plant for a period of 15 years following satisfaction
of the conditions described in Sections 6.03(A) and (D) hereof. Pasco will
pay a surcharge for chlorination and stabilization pursuant to Section 3.04(A)(2)
hereof for all Quality Water delivered to it from the Lake Bridge Water Treatment
Plant.
SECTION 6.04. TERMINATION. This
Agreement may be terminated by unanimous agreement of all Member
Governments, or upon direction of any two Member Governments if any
material provision of this Agreement (including but not limited to
the governance structure, Member Governments' voting rights, or any
other material change in the relative rights and responsibilities
of the Authority and the Member Governments) is substantively modified
by the Florida Legislature (other than enactment of the legislation
attached hereto as Appendix M) or any other person or entity that
is not a party hereto. In either event, termination shall be effective
only upon compliance with all of the following requirements:
(A) Upon receipt of (1) termination notices from all Member Governments
if the Agreement is to be terminated by unanimous consent or (2)
a termination notice from any two Member Governments if any material
provision of this Agreement has been unilaterally and substantively
modified by the Florida Legislature or any other person or entity
that is not a party hereto, the General Manager shall provide a
notice of pending termination to each Member Government.
(B) The Water Supply Facilities (including all appurtenant contracts, licenses
and Environmental Permits) and other assets of the Authority shall be sold
as follows:
(1) Each Member Government shall be entitled to purchase its
respective Termination Option Share of each Water Supply Facility
by notifying the Authority and the other Member Governments in
writing within sixty days following the date on which the General
Manager provides a notice of pending termination, as required
by Section 6.04(A). If a Member Government elects to exercise
its option, the Water Supply Facility shall be appraised by two
independent appraisers selected by the Authority, and each Member
Government shall have a period of sixty days following the receipt
of such appraisals to purchase its respective Termination Option
Share of such Water Supply Facilities upon payment of an amount
equal to its Termination Option Share of the average of the two
appraised values. The aggregate purchase price for Water Supply
Facilities purchased by each Member Government shall be reduced
by any portion of the purchase price for Transferred Assets that
has not been paid or credited to the Member Government. Conveyance
of the Water Supply Facilities shall be made in accordance with
Section 6.04(B)(4).
(2) The remaining assets of the Authority and any Water Supply Facilities
for which no option is exercised by a Member Government pursuant to Section
6.04(B)(1) shall be offered for sale by competitive bid or sold at auction,
as directed by the Board. Conveyance of the Water Supply Facilities and
other assets shall be made in accordance with Section 6.04(B)(4).
(3) Nothing herein shall be construed to prohibit any Member Government
from assigning its right to the conveyance of Water Supply Facilities,
provided however, that (a) any proposed assignment of conveyance rights
to Water Supply Facilities to any entity other than a Member Government
shall be subject to a right of first refusal in favor of the other Member
Governments, and (b) if more than one Member Government exercises its right
of first refusal, each Member Government shall be entitled to its Termination
Option Share of the conveyance rights to the Water Supply Facility.
(4) Conveyance of the Water Supply Facilities and other assets of the Authority
shall not occur prior to the date on which all Obligations of the Authority
are defeased pursuant to Section 6.04(C).
(C) The Authority shall pay or cause to be paid to the owner
of all outstanding Obligations the principal of and interest due
and payable, and thereafter to become due and payable, upon such
Obligations.
(1) Obligations shall be deemed to be paid when (a) payment
of the principal of and premium, if any, on such Obligation,
plus interest thereon to the due date thereof (whether such due
date is by reason of maturity or upon redemption as provided
in the Financing Documents), either (i) shall have been made
or caused to be made in accordance with the terms thereof, or
(11) shall have been provided for by irrevocably depositing in
trust and irrevocably setting aside exclusively for such payment
(x) moneys sufficient to make such payment and/or (y) Governmental
Obligations authorized for defeasance under the Financing Documents,
maturing as to principal and interest in such amounts and at
such time as will provide for the availability of sufficient
moneys to make such payment, and (b) all other amounts payable
in respect of such Obligations pursuant to the Financing Documents
shall have been paid or the payment thereof provided for to the
satisfaction of the Authority's bond counsel.
(2) Net proceeds from sale of the Water Supply Facilities and other assets
of the Authority shall be applied to the payment of Obligations, as set
forth in Section 6.04(C)(1) hereof.
(a) If the net proceeds are not sufficient to meet
the requirements of Section 6.04(C)(1), the General Manager shall
notify each Member Government of its respective Termination Funding
Share of the shortfall and the date on which the Authority intends
to provide for payment of the Obligations, which shall not be
earlier than sixty days from the date of such notice. Each Member
Government shall tender its Termination Funding Share of the
shortfall to the Authority, in immediately available funds, on
or prior to the date specified in the notice- provided however,
that such amounts will be payable only from Net Utility Revenue.
(b) If the net proceeds exceed the requirements of Section 6.04(C)(1),
the Authority shall tender to each Member Government its respective Termination
Funding Share of the excess on the date provision is made for payment of
the Obligations.
SECTION 6.05. SCIENTIFIC PEER REVIEW. The
parties recognize that a significant number of important Authority
actions will be taken in reliance upon scientific or technical studies
commissioned by the Board, and that there may be a divergence of
opinion regarding the findings contained in any such scientific or
technical study. Scientific or technical issues shall be resolved
in the manner set forth in this Section 6.05.
(A) Upon the affirmative vote of not less than five Directors,
the Authority shall engage additional experts to provide a peer
review of any scientific or technical study.
(B) Upon receipt of a resolution approved by the governing board of one or
more Member Governments, the Authority shall engage additional experts to
provide a peer review of any scientific or technical study.
(1) If the Board determines that the peer review is in the
best interest of the Authority, the cost of additional experts
shall be paid by the Authority.
(2) If the Board determines that the peer review is unnecessary, the cost
of additional experts shall be paid by the Member Government or Member
Governments requesting the peer review.
(C) Any Board decision specifically predicated upon the disputed
study shall be held in abeyance pending receipt of the peer review
report, unless the Authority would be prejudiced by the delay.
The Board shall establish procedures to facilitate any peer review
requested pursuant to this Section 6.05.
SECTION 6.06. DISPUTE RESOLUTION.
(A) Other than (1) disputes between the Authority and a Host
Member Government relating to Primary Environmental Permits necessary
or convenient to the acquisition, construction or operation of
a Water Supply Facility, which shall be resolved in accordance
with Sections 3.13 hereof, (2) public health and safety issues
related to the use of Reclaimed Water by the Authority, which shall
be resolved in accordance with Section 3.15 hereof, (3) issues
related to scientific and technical studies, which have been resolved
pursuant to Section 6.05 hereof, and (4) resolution of disputes
as provided in the Master Water Supply Contract, the Authority
and Member Governments agree to resolve any dispute related to
the interpretation or performance of this Agreement in the manner
described in this Section 6.06. Either party may initiate the dispute
resolution process by providing written notice to the other party.
(B) After transmittal and receipt of a notice specifying the area or areas
of disagreement, the parties agree to meet at reasonable times and places,
as mutually agreed upon, to discuss the issues.
(C) If discussions between the parties fail to resolve the dispute within
30 days of the notice described in Section 6.06(A) hereof, the parties shall
appoint a mutually acceptable neutral third-party to act as a mediator. The
mediation contemplated by this Section 6.06(C) is intended to be an informal
and non-adversarial process with the objective of helping the parties reach
a mutually acceptable and voluntary agreement. The decision-making shall
rest solely with the parties. The mediator shall assist the parties in identifying
issues, fostering joint problem-solving, and exploring settlement alternatives.
(D) If the parties are unable to reach a mediated settlement within 60 days
of the mediator's appointment, either party may terminate the settlement
discussions by written notice to the other party. In such event, either party
may initiate litigation or, where applicable, a proceeding under Section
403.412(2), Florida Statutes, within 30 days of the notice terminating the
settlement discussions. The venue for any such action, other than proceedings
under Section 403.412(2), Florida Statutes, shall be the county in which
the Authority maintains its principal office. Failure by the party initiating
the dispute resolution procedure to commence litigation or, where applicable,
a proceeding under Section 403.412(2), Florida Statutes, within the 30 day
period shall be deemed to constitute an acceptance of the interpretation
or performance of the other party.
SECTION 6.07. WAIVER OF CLAIMS. The
Member Governments hereby waive any and all claims against the Authority
and the Authority hereby waives any and all claims against the Member
Governments, arising under any statute, rule, ordinance, judicial
decision, administrative order, the common law, contract or any other
document or circumstance existing on the date of this Agreement,
or for claims arising after the date of this Agreement that are not
disclosed in writing to the Authority and all Member Governments
prior to the satisfaction of the conditions described in Sections
6.03(A) and
(D) hereof.
SECTION 6.08. ACKNOWLEDGMENT OF
EPC AGREEMENT. The parties acknowledge that the Authority
will be a party to the EPC Agreement and agree to the conditions
under which EPC will participate in the alternative dispute resolution
procedures set forth herein and therein.
SECTION 6.09. INDEMNIFICATION.
(A) To the full extent permitted by law, the Authority shall
indemnify each Director against and from any and all claims, costs,
charges and expenses (including without limitation, fees and expenses
of attorneys, expert witnesses and other consultants) which may
be imposed in connection with his or her service as a Director,
if such person acted in good faith and in a manner reasonably believed
to be in, or not opposed to, the best interest of the Authority
and, with respect to any criminal action or proceedings, had no
reasonable cause to believe such conduct was unlawful. The termination
of any proceedings by judgment, order, settlement, or its equivalent
shall not, of itself, create a presumption that the person did
not act in good faith and in a manner which he or she reasonably
believed to be in, or not opposed to, the best interest of the
Authority, or, with respect to any criminal action or proceeding,
had reasonable cause to believe that his or her conduct was unlawful.
(B) The Authority agrees to save harmless and assume the defense of and indemnify
the Member Governments and their officers, employees, contractors and consultants
against and from any and all claims, costs, charges and expenses (including
without limitation, fees and expenses of attorneys, expert witnesses and
other consultants) which may be imposed against the Member Governments and
their officers, employees, contractors and consultants by reason of any of
the following occurring during the term of this Agreement-.
(1) Any negligent or tortious act, error or omission of the
Authority or any of its personnel, employees, contractors or
consultants in the construction, expansion, replacement, operation,
and/or maintenance of the Authority's Water Supply Facilities;
and
(2) Any failure by the Authority or any of its personnel, employees, consultants
or contractors, to perform its obligations under this Agreement or any
negligent act or tortious act, error or omission of the Authority its personnel,
employees, consultants or contractors.
(C) In case any claim shall be made or action brought against
any person in or entity respect of which indemnity may be sought
against the Authority, such indemnified person or entity shall
promptly notify the Authority in writing setting forth the particulars
of such claim or action. The indemnified person or entity shall
be entitled to select and retain counsel of his or her choice.
The Authority shall be responsible for the payment or immediate
reimbursement for all reasonable fees and expenses incurred in
the defense of such claim or action.
SECTION 6.10. SOVEREIGN IMMUNITY. The
Member Governments intend to avail themselves of the benefits of
Sections 768.28 and 163.01(9)(c), Florida Statutes, and of other
statutes and the common law governing sovereign immunity to the fullest
extent possible. In accordance with Section 163.01(5)(o), Florida
Statutes, therefore, the Member Governments are not jointly liable
for the torts of the officers or employees of the Authority, or any
other tort attributable to the Authority, and that only the Authority
shall be liable for torts attributable to it or for torts of its
officers or employees, and then only to the extent of the waiver
of sovereign immunity or limitation of liability specified in Section
768.28, Florida Statutes. The Member Governments intend the Authority
to have all of the privileges and immunities from liability and exemptions
from laws, ordinances, rules and common law which apply to the municipalities
and counties of the State of Florida. Nothing in this Agreement is
intended to inure to the benefit of any third-party for the purpose
of allowing any claim which would otherwise be barred under the doctrine
of sovereign immunity or by operation of law.
SECTION 6.11. NOTICE. All
notices, demands, requests and other communications hereunder shall
be deemed sufficient and properly given, if in writing and delivered
in person to the following addresses or sent by certified or registered
mail, postage prepaid with return receipt requested, at such addresses;
provided, if such notices, demands, requests or other communications
are sent by mail, they shall be deemed as given on the third day
following such mailing which is not a Saturday, Sunday or a day on
which United States mail is not delivered:
If to the Authority: West Coast Regional Water Supply Authority
2535 Landmark Drive, Suite 211
Clearwater, Florida 33761
Attention: General Manager
If to Pinellas: Board of County Commissioners
315 Court Street
Clearwater, Florida 34616
Attention: County Administrator
If to Pasco: Board of County Commissioners
7530 Little Road, Room 340
West Pasco Government Center
New Port Richey, Florida 34654
Attention: County Administrator
If to Hillsborough: Board of County Commissioners
601 East Kennedy Boulevard, 26th Floor
Tampa, Florida 33602
Attention: County Administrator
If to St. Petersburg: City of St. Petersburg
One Fourth Street North
St. Petersburg, Florida 33701
Attention: City Administrator
If to Tampa: City of Tampa
315 East Kennedy Boulevard
Tampa, Florida 33602
Attention: Mayor
If to New Port Richey: City of New Port Richey
5919 Main Street
New Port Richey, Florida 34652
Attention: City Manager
Any party may, by like notice, designate any further or different
addresses to which subsequent notices shall be sent. Any notices
hereunder signed on behalf of the notifying party by a duly authorized
attorney at law shall be valid and effective to the same extent as
if signed on behalf of such party by a duly authorized officer or
employee.
SECTION 6.12. ENTIRE AGREEMENT. This
Agreement constitutes the entire agreement among the parties pertaining
to the subject matter hereof, and supercedes (except as expressly
provided herein) all prior and contemporaneous agreements, understandings,
negotiations and discussions of the parties, whether oral or written,
and there are no warranties, representations or other agreements
between the parties in connection with the subject matter hereof,
except as specifically set forth herein.
SECTION 6.13. AMENDMENTS AND WAIVERS. No
amendment, supplement, modification or waiver of this Agreement,
including but not limited to the admission of additional Member Governments
or the withdrawal of any Member Government, shall be binding unless
executed in writing by all parties hereto. No waiver of any of the
provisions of this Agreement shall be deemed or shall constitute
a waiver of any other provision of this Agreement, whether or not
similar, unless otherwise expressly provided. Each such amendment,
supplement, modification or waiver of this Agreement shall be filed
with the Clerk of the Circuit Court in Hillsborough County, Pasco
County and Pinellas County.
SECTION 6.14. BINDING EFFECT. This
Agreement shall be binding upon the parties, their respective successors
and assigns and shall inure to the benefit of the parties, their
respective successors and assigns.
SECTION 6.15. SEVERABILITY. In
the event any provision of this Agreement shall be held invalid or
unenforceable by any court of competent jurisdiction, such holding
shall not invalidate or render unenforceable any other provision
hereof- provided however, that if any material provision of this
Agreement (including but not limited to the governance structure,
Member Governments' voting rights, or any other material change in
the relative rights and responsibilities of the Authority and the
Member Governments, but excluding initial enactment of the legislation
attached hereto as Appendix M) is substantively modified by the Florida
Legislature or any other person or entity that is not a party hereto,
this Agreement may be terminated pursuant to Section 6.04 hereof.
SECTION 6.16. EXECUTION IN COUNTERPARTS. This
Agreement may be simultaneously executed in several counterparts,
each of which shall be an original and all of which shall constitute
but one and the same instrument.
SECTION 6.17. APPLICABLE LAW. This
Agreement shall be governed by and construed in accordance with the
laws of the State.
IN WITNESS WHEREOF, the Board of County Commissioners
of Hillsborough County, Florida, has caused this Agreement to be
executed and delivered as of the day and year first above written. |