Water, wastewater and reclaimed water technical manual

General

Section 1

Project Review and Acceptance Process

1.1 Introduction

  • 1.2 Project Review Process
  • 1.3 Right-of-Way Use Permit Submittals
  • 1.4 Dedication of Easements
  • 1.5 Authority of Inspectors
  • 1.6 Requirements of Acceptance
  • 1.7 Utilities Product Review Committee

Section 2

Preparation of Master Plans, Construction Plans, and Record Drawings

  • 2.1 Master Plan
  • 2.2 Construction Plan Format
  • 2.3 Standard Items for Construction Plan Review
  • 2.4 Record Drawing Submittals

Section 3

Specifications for Drinking Water Distribution Systems Design Standards

  • 3.1 General
  • 3.2 Plans Preparation
  • 3.3 Plans Review
  • 3.4 Project Acceptance
  • 3.5 System Design and Flow Criteria
  • 3.6 Water Details

Section 4

Specifications for Wastewater Collection/Transmission Systems Design Standards

  • 4.1 General
  • 4.2 Plans Preparation
  • 4.3 Plans Review
  • 4.4 Project Acceptance
  • 4.5 System Design and Flow Criteria
  • 4.6 Wastewater Detail

Section 5

Specifications for Reclaimed Water System Design

  • 5.1 General
  • 5.2 Plans Preparation
  • 5.3 Plans Review
  • 5.4 Project Acceptance
  • 5.5 System Design
  • 5.6 Reclaimed Water Details

Public Utilities Technical Manuals Appendices