Various building permit fees and information

Fee schedule

View or download the current fee schedule.
Current Permit Fee Schedule (PDF) - (Effective 9/9/23)

Fees for permits or services not specified in any of the fee schedules will be calculated by the Building Official or their designee utilizing the most current fee study methodology based on the estimated actual cost to perform the work.

Fee schedule phases

The current fee schedule will happen in two phases:

  • Phase one is effective on 9/9/2023 and does not include any inspection fee increases
  • Phase two is effective on 10/5/2024 and will be the full cost per square foot
  • The above PDF (Current permit fee schedule) shows only the phase one fees
  • The PDF below shows phase one and two fees

Fee Schedule - Phase 1 & 2